BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Storia//Construction events calendar//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Construction events · Storia
X-WR-CALDESC:Construction conferences and trade shows. Dates as published b
 y each organizer.
BEGIN:VEVENT
UID:cmaa-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261004
DTEND;VALUE=DATE:20261007
SUMMARY:CMAA2026 National Conference & Trade Show
LOCATION:Gaylord Rockies\, Aurora (Denver)\, United States
DESCRIPTION:CMAA's annual conference and trade show for construction and pr
 ogram managers\, owners and consultants.\nhttps://www.cmaanet.org/CMAA2026
 \nStoria does not organize this event. Confirm details on the official sit
 e.
URL:https://www.cmaanet.org/CMAA2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:pce-usa-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261005
DTEND;VALUE=DATE:20261008
SUMMARY:Project Controls Expo USA 2026
LOCATION:Nationals Park\, Washington\, DC\, United States
DESCRIPTION:A workshop and two-day expo for planners\, schedulers\, cost en
 gineers and project controls leads\, with a public-sector focus.\nhttps://
 projectcontrolexpo.com/usa\nStoria does not organize this event. Confirm d
 etails on the official site.
URL:https://projectcontrolexpo.com/usa
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:cib-w78-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261006
DTEND;VALUE=DATE:20261009
SUMMARY:43rd International CIB W78 Conference on IT in Construction
LOCATION:Indian Institute of Technology Delhi\, New Delhi\, India
DESCRIPTION:The long-running research conference on information technology 
 in construction: BIM\, data\, AI and digital workflows.\nhttps://cibw78-20
 26.com/\nStoria does not organize this event. Confirm details on the offic
 ial site.
URL:https://cibw78-2026.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:yii-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261006
DTEND;VALUE=DATE:20261008
SUMMARY:Year in Infrastructure 2026
LOCATION:Fairmont Singapore\, Singapore\, Singapore
DESCRIPTION:Bentley's annual infrastructure event\, where YII Awards finali
 sts present their projects and the winners are announced.\nhttps://www.ben
 tley.com/\nStoria does not organize this event. Confirm details on the off
 icial site.
URL:https://www.bentley.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:lci-congress-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261012
DTEND;VALUE=DATE:20261017
SUMMARY:28th Annual Lean Construction Institute Congress
LOCATION:Signia by Hilton Atlanta\, Atlanta\, United States
DESCRIPTION:The largest US lean design and construction gathering\, for own
 ers\, designers\, contractors\, trade partners and researchers.\nhttps://c
 ongress.leanconstruction.org/\nStoria does not organize this event. Confir
 m details on the official site.
URL:https://congress.leanconstruction.org/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:builtworlds-tokyo-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261013
DTEND;VALUE=DATE:20261016
SUMMARY:BuiltWorlds 2026 Tokyo Global Summit
LOCATION:Hilton Tokyo\, Tokyo\, Japan
DESCRIPTION:Three days of site tours\, keynotes and startup demos on roboti
 cs\, AI and infrastructure in Japan.\nhttps://builtworlds.com/event/2026-t
 okyo-summit/\nStoria does not organize this event. Confirm details on the 
 official site.
URL:https://builtworlds.com/event/2026-tokyo-summit/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:osgoode-construction-arbitration-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261014
DTEND;VALUE=DATE:20261016
SUMMARY:Construction Arbitration: Strategy and Practice in a Specialized Fo
 rum 2026
LOCATION:Osgoode Professional Development\, 1 Dundas Street West\, Toronto\
 , Canada
DESCRIPTION:A program for counsel\, arbitrators and experts on designing an
 d running construction arbitrations.\nhttps://osgoodepd.ca/professional-de
 velopment/short-courses-and-conferences/construction-arbitration-strategy-
 and-practice-in-a-specialized-forum-2026/\nStoria does not organize this e
 vent. Confirm details on the official site.
URL:https://osgoodepd.ca/professional-development/short-courses-and-confere
 nces/construction-arbitration-strategy-and-practice-in-a-specialized-forum
 -2026/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:excon-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261014
DTEND;VALUE=DATE:20261018
SUMMARY:EXCON 2026\, XXIX Exposición Internacional del Sector de la Constr
 ucción
LOCATION:Centro de Exposiciones Jockey\, Lima\, Peru
DESCRIPTION:Peru's main construction fair\, with exhibits\, business meetin
 gs and technical talks for contractors\, engineers and developers.\nhttps:
 //excon.pe/\nStoria does not organize this event. Confirm details on the o
 fficial site.
URL:https://excon.pe/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:expo-cihac-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261014
DTEND;VALUE=DATE:20261017
SUMMARY:Expo CIHAC 2026
LOCATION:Centro Banamex\, Mexico City\, Mexico
DESCRIPTION:Mexico's leading construction and housing show\, for contractor
 s\, architects\, developers and suppliers from across Latin America.\nhttp
 s://www.expocihac.com/\nStoria does not organize this event. Confirm detai
 ls on the official site.
URL:https://www.expocihac.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:icc-fidic-bogota-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261015
DTEND;VALUE=DATE:20261017
SUMMARY:2026 ICC-FIDIC Conference on International Construction Contracts a
 nd Dispute Resolution
LOCATION:Cámara de Comercio de Bogotá\, Sede Salitre\, Bogotá\, Colombia
DESCRIPTION:The annual ICC and FIDIC conference on FIDIC contracts\, disput
 e boards and arbitration for engineers\, contractors and lawyers.\nhttps:/
 /events2go.iccwbo.org/event/2026-icc-fidic-conference-on-international-con
 struction-contracts-and-dispute-resolution\nStoria does not organize this 
 event. Confirm details on the official site.
URL:https://events2go.iccwbo.org/event/2026-icc-fidic-conference-on-interna
 tional-construction-contracts-and-dispute-resolution
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:bim-quebec-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261020
DTEND;VALUE=DATE:20261021
SUMMARY:Congrès 2026 du Groupe BIM du Québec
LOCATION:777\, boulevard Robert-Bourassa\, Montréal\, Canada
DESCRIPTION:Québec's annual BIM and digital construction congress\, with t
 alks\, an exhibit hall\, technology demos and awards.\nhttps://www.bimqueb
 ec.org/\nStoria does not organize this event. Confirm details on the offic
 ial site.
URL:https://www.bimquebec.org/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:edifica-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261020
DTEND;VALUE=DATE:20261023
SUMMARY:Edifica 2026\, 24ª Feria Internacional de la Construcción
LOCATION:Espacio Riesco\, Santiago\, Chile
DESCRIPTION:Chile's biennial construction fair\, covering the whole value c
 hain from material suppliers to contractors and developers.\nhttps://edifi
 ca.cl/\nStoria does not organize this event. Confirm details on the offici
 al site.
URL:https://edifica.cl/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:greenbuild-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261020
DTEND;VALUE=DATE:20261024
SUMMARY:Greenbuild International Conference + Expo 2026
LOCATION:Javits Center\, New York\, United States
DESCRIPTION:The major green building conference and expo for architects\, d
 evelopers\, contractors and sustainability leads.\nhttps://informaconnect.
 com/greenbuild/\nStoria does not organize this event. Confirm details on t
 he official site.
URL:https://informaconnect.com/greenbuild/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:groundbreak-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261020
DTEND;VALUE=DATE:20261023
SUMMARY:Procore Groundbreak 2026
LOCATION:Orange County Convention Center\, Orlando\, United States
DESCRIPTION:Procore's annual construction conference\, with workshops on th
 e first day and a free virtual Groundbreak+ stream.\nhttps://www.procore.c
 om/groundbreak\nStoria does not organize this event. Confirm details on th
 e official site.
URL:https://www.procore.com/groundbreak
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:aba-forum-fall-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261021
DTEND;VALUE=DATE:20261024
SUMMARY:ABA Forum on Construction Law 2026 Fall Conference: Construction Cl
 aims Summit
LOCATION:The Westin Copley Place\, Boston\, United States
DESCRIPTION:A claims-focused meeting on delay\, defects\, differing site co
 nditions and terminations for lawyers and claims consultants.\nhttps://eve
 nts.americanbar.org/event/130be80c-3113-4ea2-988b-efa7492a8f97/summary\nSt
 oria does not organize this event. Confirm details on the official site.
URL:https://events.americanbar.org/event/130be80c-3113-4ea2-988b-efa7492a8f
 97/summary
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:buildex-alberta-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261021
DTEND;VALUE=DATE:20261023
SUMMARY:BUILDEX Alberta 2026
LOCATION:BMO Centre at Stampede Park\, Calgary\, Canada
DESCRIPTION:Alberta's trade show and conference for the people who design\,
  build and manage commercial\, institutional and residential buildings.\nh
 ttps://informaconnect.com/buildex-alberta/\nStoria does not organize this 
 event. Confirm details on the official site.
URL:https://informaconnect.com/buildex-alberta/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:digital-construction-summit-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261021
DTEND;VALUE=DATE:20261022
SUMMARY:Digital Construction Summit 2026
LOCATION:Habtoor Grand JBR\, Dubai\, United Arab Emirates
DESCRIPTION:A one-day Middle East summit on digital transformation\, AI and
  safety technology for senior construction leaders.\nhttps://2026.digitalc
 onstructionsummit.com/\nStoria does not organize this event. Confirm detai
 ls on the official site.
URL:https://2026.digitalconstructionsummit.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:pmi-global-summit-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261021
DTEND;VALUE=DATE:20261025
SUMMARY:PMI Global Summit 2026
LOCATION:Huntington Place\, Detroit\, United States
DESCRIPTION:PMI's flagship gathering for project\, program and portfolio pr
 ofessionals.\nhttps://events.pmi.org/flow/pmi/gsdetroit26/landing/page/hom
 e\nStoria does not organize this event. Confirm details on the official si
 te.
URL:https://events.pmi.org/flow/pmi/gsdetroit26/landing/page/home
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:asce-forensic-congress-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261022
DTEND;VALUE=DATE:20261026
SUMMARY:11th Forensic Engineering Congress
LOCATION:Hilton Orlando Lake Buena Vista\, Lake Buena Vista (Orlando)\, Uni
 ted States
DESCRIPTION:Failure investigation and dispute resolution\, for forensic eng
 ineers\, owners\, insurers and legal professionals.\nhttps://www.forensicc
 ongress.org/\nStoria does not organize this event. Confirm details on the 
 official site.
URL:https://www.forensiccongress.org/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:contech-quebec-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261022
DTEND;VALUE=DATE:20261023
SUMMARY:Expo Contech Bâtiment Québec 2026
LOCATION:Centre de foires d'ExpoCité\, Québec City\, Canada
DESCRIPTION:A one-day building industry expo with exhibits\, talks and tech
 nical demos for architects\, engineers and contractors.\nhttps://contech.q
 c.ca/\nStoria does not organize this event. Confirm details on the officia
 l site.
URL:https://contech.qc.ca/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:gar-construction-london-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261022
DTEND;VALUE=DATE:20261023
SUMMARY:GAR Live: Construction Disputes London 2026
LOCATION:Merchant Taylors' Hall\, London\, United Kingdom
DESCRIPTION:The first London edition of GAR's construction disputes confere
 nce\, for arbitration counsel\, arbitrators and experts.\nhttps://events.g
 lobalarbitrationreview.com/constructiondisputeslondon2026/11696789\nStoria
  does not organize this event. Confirm details on the official site.
URL:https://events.globalarbitrationreview.com/constructiondisputeslondon20
 26/11696789
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:escl-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261023
DTEND;VALUE=DATE:20261025
SUMMARY:ESCL Annual Conference 2026: Global Turmoils\, Uncertainties in Con
 struction Projects
LOCATION:The Marmara Pera\, Istanbul\, Türkiye
DESCRIPTION:The European construction law conference\, this year on price e
 scalation\, time management\, AI and dispute resolution.\nhttps://event.sc
 lturkey.org/ESCL-2026/\nStoria does not organize this event. Confirm detai
 ls on the official site.
URL:https://event.sclturkey.org/ESCL-2026/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:paris-infraweek-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261102
DTEND;VALUE=DATE:20261107
SUMMARY:Paris InfraWeek 2026
LOCATION:Paris\, France
DESCRIPTION:A week of infrastructure conferences on energy\, digital and tr
 ansport assets for investors\, developers\, lawyers and public leaders.\nh
 ttps://www.parisinfraweek.com/\nStoria does not organize this event. Confi
 rm details on the official site.
URL:https://www.parisinfraweek.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:pce-uk-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261102
DTEND;VALUE=DATE:20261105
SUMMARY:Project Controls Expo UK 2026
LOCATION:Wembley Stadium\, London\, United Kingdom
DESCRIPTION:A bootcamp\, two-day expo and awards for planning\, cost and ri
 sk professionals on UK infrastructure.\nhttps://projectcontrolexpo.com/uk\
 nStoria does not organize this event. Confirm details on the official site
 .
URL:https://projectcontrolexpo.com/uk
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:building-transformations-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261104
DTEND;VALUE=DATE:20261106
SUMMARY:The Future of Design and Construction\, 2026 Toronto Summit
LOCATION:MaRS Discovery District\, Toronto\, Canada
DESCRIPTION:A summit on digital design and construction for contractors\, e
 ngineers\, owners\, technology vendors and government.\nhttps://www.buildi
 ngtransformations.org/events/contech26\nStoria does not organize this even
 t. Confirm details on the official site.
URL:https://www.buildingtransformations.org/events/contech26
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:canada-infrastructure-conference-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261109
DTEND;VALUE=DATE:20261111
SUMMARY:Canada's Infrastructure Conference 2026
LOCATION:Toronto\, Canada
DESCRIPTION:Canada's annual forum on infrastructure delivery and P3s for pu
 blic owners\, contractors\, investors and advisors.\nhttps://www.pppcounci
 l.ca/events/annual-conference\nStoria does not organize this event. Confir
 m details on the official site.
URL:https://www.pppcouncil.ca/events/annual-conference
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:trimble-dimensions-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261109
DTEND;VALUE=DATE:20261112
SUMMARY:Trimble Dimensions User Conference 2026
LOCATION:The Venetian Resort Las Vegas\, Las Vegas\, United States
DESCRIPTION:Trimble's user conference for construction\, geospatial and inf
 rastructure teams working across its software and hardware.\nhttps://www.t
 rimble.com/en/our-company/events/dimensions/overview\nStoria does not orga
 nize this event. Confirm details on the official site.
URL:https://www.trimble.com/en/our-company/events/dimensions/overview
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:semana-construccion-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261110
DTEND;VALUE=DATE:20261114
SUMMARY:Semana Internacional de la Construcción 2026 (CONSTRUTEC\, VETECO\
 , SMART DOORS)
LOCATION:IFEMA MADRID\, Madrid\, Spain
DESCRIPTION:Spain's combined construction week on materials\, windows and f
 acades\, and doors\, for architects\, contractors and installers.\nhttps:/
 /www.ifema.es/en/construtec\nStoria does not organize this event. Confirm 
 details on the official site.
URL:https://www.ifema.es/en/construtec
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:drbf-africa-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261111
DTEND;VALUE=DATE:20261114
SUMMARY:DRBF Africa Conference & Workshops 2026
LOCATION:Mövenpick Kigali\, Kigali\, Rwanda
DESCRIPTION:Workshops and a conference on dispute boards and dispute avoida
 nce for African infrastructure owners and contractors.\nhttps://drb.glueup
 .com/event/drbf-africa-conference-workshops-168875/\nStoria does not organ
 ize this event. Confirm details on the official site.
URL:https://drb.glueup.com/event/drbf-africa-conference-workshops-168875/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:contech-montreal-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261112
DTEND;VALUE=DATE:20261113
SUMMARY:Expo Contech Bâtiment Montréal 2026
LOCATION:Palais des congrès de Montréal\, Montréal\, Canada
DESCRIPTION:A free one-day building industry expo with exhibits\, talks and
  technical demos for architects\, engineers and contractors.\nhttps://mont
 real.expocontech.ca/\nStoria does not organize this event. Confirm details
  on the official site.
URL:https://montreal.expocontech.ca/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:aubea-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261115
DTEND;VALUE=DATE:20261119
SUMMARY:AUBEA 2026\, 49th Australasian Universities Building Education Asso
 ciation Conference
LOCATION:Western Sydney University\, Parramatta City Campus\, Parramatta (S
 ydney)\, Australia
DESCRIPTION:An academic conference on smart\, sustainable and resilient des
 ign and construction\, for built-environment researchers and educators.\nh
 ttps://www.aubea.org/aubea2026\nStoria does not organize this event. Confi
 rm details on the official site.
URL:https://www.aubea.org/aubea2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:scl-singapore-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261117
DTEND;VALUE=DATE:20261118
SUMMARY:SCL(S) Conference 2026: Technology\, Legal Innovation and Singapore
 's Built Future
LOCATION:Singapore\, Singapore
DESCRIPTION:A one-day construction law conference on AI in delay analysis\,
  digital evidence in disputes and project records automation.\nhttps://www
 .sclinternational.org/events/scls-conference-2026-technology-legal-innovat
 ion-and-singapores-built-future-17-november\nStoria does not organize this
  event. Confirm details on the official site.
URL:https://www.sclinternational.org/events/scls-conference-2026-technology
 -legal-innovation-and-singapores-built-future-17-november
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:sommet-bim-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261117
DTEND;VALUE=DATE:20261119
SUMMARY:Sommet BIM+ 2026 : pour le futur des infrastructures
LOCATION:Centre des congrès de Québec\, Québec City\, Canada
DESCRIPTION:The Québec government's free summit on BIM\, offsite construct
 ion\, digital twins and AI for public owners\, contractors and designers.\
 nhttps://www.sqi.gouv.qc.ca/feuille-de-route-gouvernementale-pour-le-bim/s
 ommet-bim\nStoria does not organize this event. Confirm details on the off
 icial site.
URL:https://www.sqi.gouv.qc.ca/feuille-de-route-gouvernementale-pour-le-bim
 /sommet-bim
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:builtworlds-venture-east-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261118
DTEND;VALUE=DATE:20261120
SUMMARY:BuiltWorlds 2026 AEC Emerging Tech (Venture East)
LOCATION:Convene One Boston Place\, Boston\, United States
DESCRIPTION:A construction tech venture conference with a startup demo day\
 , for contractors\, investors and founders.\nhttps://builtworlds.com/event
 /2026-venture-east/\nStoria does not organize this event. Confirm details 
 on the official site.
URL:https://builtworlds.com/event/2026-venture-east/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dcn-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261118
DTEND;VALUE=DATE:20261119
SUMMARY:Digital Construction North 2026
LOCATION:Manchester Central\, Manchester\, United Kingdom
DESCRIPTION:A free one-day show on BIM\, AI\, digital twins and project del
 ivery in the north of England.\nhttps://www.digitalconstructionnorth.com/\
 nStoria does not organize this event. Confirm details on the official site
 .
URL:https://www.digitalconstructionnorth.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:adjudication-society-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261119
DTEND;VALUE=DATE:20261120
SUMMARY:Adjudication Society Annual Conference 2026
LOCATION:The Birmingham Conference & Events Centre\, Birmingham\, United Ki
 ngdom
DESCRIPTION:The 25th annual conference on UK construction adjudication\, fo
 r adjudicators\, lawyers\, claims consultants and contractors.\nhttps://ww
 w.adjudication.org/civicrm/event/info?id=419&reset=1\nStoria does not orga
 nize this event. Confirm details on the official site.
URL:https://www.adjudication.org/civicrm/event/info?id=419&reset=1
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:iccrem-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261120
DTEND;VALUE=DATE:20261123
SUMMARY:ICCREM 2026\, International Conference on Construction and Real Est
 ate Management
LOCATION:City University of Hong Kong\, Hong Kong\, China
DESCRIPTION:A research conference on construction and real estate managemen
 t\, themed this year on AI and the built environment.\nhttp://www.iccrem.c
 om/\nStoria does not organize this event. Confirm details on the official 
 site.
URL:http://www.iccrem.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:big5-global-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261123
DTEND;VALUE=DATE:20261127
SUMMARY:Big 5 Global 2026
LOCATION:Dubai World Trade Centre\, Dubai\, United Arab Emirates
DESCRIPTION:The Middle East's largest construction trade show\, spanning bu
 ilding products\, technology and urban development.\nhttps://www.big5globa
 l.com/\nStoria does not organize this event. Confirm details on the offici
 al site.
URL:https://www.big5global.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:pce-australia-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261123
DTEND;VALUE=DATE:20261126
SUMMARY:Project Controls Expo Australia 2026
LOCATION:Melbourne Cricket Ground\, Melbourne\, Australia
DESCRIPTION:A workshop and two-day expo for planners\, cost engineers\, ris
 k managers and PMO leads in Australian infrastructure.\nhttps://projectcon
 trolexpo.com/aus\nStoria does not organize this event. Confirm details on 
 the official site.
URL:https://projectcontrolexpo.com/aus
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:bim-world-munich-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261124
DTEND;VALUE=DATE:20261126
SUMMARY:BIM World MUNICH 2026
LOCATION:ICM\, Internationales Congress Center Messe München\, Munich\, Ge
 rmany
DESCRIPTION:An international meeting point for digital construction and fac
 ility management\, from BIM to digital twins.\nhttps://www.bim-world.de/\n
 Storia does not organize this event. Confirm details on the official site.
URL:https://www.bim-world.de/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fidic-icuc-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261130
DTEND;VALUE=DATE:20261204
SUMMARY:FIDIC International Contract Users' Conference and Awards 2026
LOCATION:London\, United Kingdom
DESCRIPTION:FIDIC's annual contracts gathering\, with a dispute avoidance a
 nd adjudication forum\, a conference and awards.\nhttps://events.fidic.org
 /icuc26\nStoria does not organize this event. Confirm details on the offic
 ial site.
URL:https://events.fidic.org/icuc26
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:construction-superconference-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261201
DTEND;VALUE=DATE:20261204
SUMMARY:Construction SuperConference 2026
LOCATION:Hyatt Regency Huntington Beach\, Huntington Beach\, United States
DESCRIPTION:A long-running US conference on construction law\, risk\, claim
 s and project delivery.\nhttps://constructionsuperconference.com/\nStoria 
 does not organize this event. Confirm details on the official site.
URL:https://constructionsuperconference.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:buildings-show-2026@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20261202
DTEND;VALUE=DATE:20261205
SUMMARY:The Buildings Show 2026\, with Construct Canada
LOCATION:Metro Toronto Convention Centre\, Toronto\, Canada
DESCRIPTION:Canada's largest building industry show\, combining Construct C
 anada\, PM Expo and the HomeBuilder and Renovator Expo.\nhttps://informaco
 nnect.com/the-buildings-show/\nStoria does not organize this event. Confir
 m details on the official site.
URL:https://informaconnect.com/the-buildings-show/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:bau-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270111
DTEND;VALUE=DATE:20270116
SUMMARY:BAU 2027
LOCATION:Messe München\, Munich\, Germany
DESCRIPTION:The leading trade fair for architecture\, materials and systems
 \, including digital building solutions.\nhttps://bau-muenchen.com/en/\nSt
 oria does not organize this event. Confirm details on the official site.
URL:https://bau-muenchen.com/en/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:world-of-concrete-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270118
DTEND;VALUE=DATE:20270122
SUMMARY:World of Concrete 2027
LOCATION:Las Vegas Convention Center\, Las Vegas\, United States
DESCRIPTION:The leading show for commercial concrete and masonry constructi
 on. Education starts on the 18th\, exhibits run the 19th to the 21st.\nhtt
 ps://www.worldofconcrete.com/\nStoria does not organize this event. Confir
 m details on the official site.
URL:https://www.worldofconcrete.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:iccbei-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270120
DTEND;VALUE=DATE:20270123
SUMMARY:ICCBEI 2027\, 7th International Conference on Civil and Building En
 gineering Informatics
LOCATION:Sir Owen G Glenn Building\, University of Auckland\, Auckland\, Ne
 w Zealand
DESCRIPTION:A research conference on computing in civil and building engine
 ering: BIM\, digital twins and construction AI.\nhttps://www.iccbei2027.au
 ckland.ac.nz/\nStoria does not organize this event. Confirm details on the
  official site.
URL:https://www.iccbei2027.auckland.ac.nz/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ibs-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270202
DTEND;VALUE=DATE:20270205
SUMMARY:2027 NAHB International Builders' Show
LOCATION:Las Vegas Convention Center\, Las Vegas\, United States
DESCRIPTION:North America's largest residential construction show\, part of
  Design & Construction Week.\nhttps://www.buildersshow.com/\nStoria does n
 ot organize this event. Confirm details on the official site.
URL:https://www.buildersshow.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:drbf-centroamerica-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270204
DTEND;VALUE=DATE:20270206
SUMMARY:DRBF Conferencia Centroamericana 2027
LOCATION:Guatemala City\, Guatemala
DESCRIPTION:A regional DRBF conference on dispute boards and dispute avoida
 nce for Central American infrastructure.\nhttps://www.drbf.org/events\nSto
 ria does not organize this event. Confirm details on the official site.
URL:https://www.drbf.org/events
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:buildex-vancouver-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270210
DTEND;VALUE=DATE:20270212
SUMMARY:BUILDEX Vancouver 2027
LOCATION:Vancouver Convention Centre West\, Vancouver\, Canada
DESCRIPTION:Western Canada's largest built environment show and conference\
 , for architects\, contractors\, developers and property managers.\nhttps:
 //informaconnect.com/buildex-vancouver/\nStoria does not organize this eve
 nt. Confirm details on the official site.
URL:https://informaconnect.com/buildex-vancouver/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:cegq-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270210
DTEND;VALUE=DATE:20270213
SUMMARY:Congrès 2027 de la CEGQ
LOCATION:Château Frontenac\, Québec City\, Canada
DESCRIPTION:The annual congress of Québec's general contractors\, with tal
 ks and networking for contractors and their partners.\nhttps://congres.ceg
 q.com/fr/\nStoria does not organize this event. Confirm details on the off
 icial site.
URL:https://congres.cegq.com/fr/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:osgoode-delay-claims-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270210
DTEND;VALUE=DATE:20270211
SUMMARY:Managing Delay and Impact Claims in Construction for 2027
LOCATION:Osgoode Professional Development\, 1 Dundas Street West\, Toronto\
 , Canada
DESCRIPTION:Schedule logic\, records\, expert evidence and quantum methods 
 for construction delay and impact claims.\nhttps://osgoodepd.ca/profession
 al-development/short-courses-and-conferences/managing-delay-and-impact-cla
 ims-in-construction-for-2027/\nStoria does not organize this event. Confir
 m details on the official site.
URL:https://osgoodepd.ca/professional-development/short-courses-and-confere
 nces/managing-delay-and-impact-claims-in-construction-for-2027/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:geo-week-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270223
DTEND;VALUE=DATE:20270226
SUMMARY:Geo Week 2027
LOCATION:Salt Palace Convention Center\, Salt Lake City\, United States
DESCRIPTION:Where geospatial and built-world technology meet: reality captu
 re\, lidar\, mapping and AEC workflows.\nhttps://www.geo-week.com/\nStoria
  does not organize this event. Confirm details on the official site.
URL:https://www.geo-week.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:asce-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270301
DTEND;VALUE=DATE:20270306
SUMMARY:ASCE2027: The Infrastructure and Engineering Experience
LOCATION:Pennsylvania Convention Center\, Philadelphia\, United States
DESCRIPTION:ASCE's first combined flagship event\, including the Constructi
 on Institute Summit\, on AI\, digital twins and construction methods.\nhtt
 ps://experience.asce.org/\nStoria does not organize this event. Confirm de
 tails on the official site.
URL:https://experience.asce.org/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:scl-leeds-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270305
DTEND;VALUE=DATE:20270306
SUMMARY:SCL Leeds Annual Spring Conference 2027
LOCATION:Royal Armouries\, Leeds\, United Kingdom
DESCRIPTION:The Society of Construction Law's annual regional conference in
  the north of England.\nhttps://www.scl.org.uk/events\nStoria does not org
 anize this event. Confirm details on the official site.
URL:https://www.scl.org.uk/events
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:cii-spring-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270308
DTEND;VALUE=DATE:20270311
SUMMARY:CII Spring 2027 Conference
LOCATION:Washington\, DC\, United States
DESCRIPTION:Owners\, contractors and university researchers share findings 
 on capital project delivery.\nhttps://www.construction-institute.org/\nSto
 ria does not organize this event. Confirm details on the official site.
URL:https://www.construction-institute.org/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:abc-convention-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270309
DTEND;VALUE=DATE:20270312
SUMMARY:ABC Convention 2027
LOCATION:Gaylord Rockies Resort and Convention Center\, Aurora (Denver)\, U
 nited States
DESCRIPTION:The merit shop contractors' convention\, with craft championshi
 ps\, construction awards and a technology expo.\nhttps://abcconvention.abc
 .org/\nStoria does not organize this event. Confirm details on the officia
 l site.
URL:https://abcconvention.abc.org/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:cca-conference-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270309
DTEND;VALUE=DATE:20270313
SUMMARY:CCA Annual Conference 2027
LOCATION:Fallsview Casino Resort\, Niagara Falls\, Canada
DESCRIPTION:The national conference of the Canadian Construction Associatio
 n\, for contractors\, owners and industry leaders.\nhttps://www.cca-acc.co
 m/events/cca-annual-conference/\nStoria does not organize this event. Conf
 irm details on the official site.
URL:https://www.cca-acc.com/events/cca-annual-conference/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:rebuild-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270316
DTEND;VALUE=DATE:20270319
SUMMARY:REBUILD 2027
LOCATION:IFEMA MADRID\, Madrid\, Spain
DESCRIPTION:Spain's innovation expo and Construction 4.0 congress on indust
 rialized\, sustainable and digital building.\nhttps://www.rebuildexpo.com/
 en/\nStoria does not organize this event. Confirm details on the official 
 site.
URL:https://www.rebuildexpo.com/en/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ai-in-aec-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270317
DTEND;VALUE=DATE:20270319
SUMMARY:AI in AEC 2027
LOCATION:Clarion Hotel Helsinki\, Helsinki\, Finland
DESCRIPTION:A conference on artificial intelligence in architecture\, engin
 eering and construction for practitioners and researchers.\nhttps://events
 .ril.fi/en/events/ai-in-aec.html\nStoria does not organize this event. Con
 firm details on the official site.
URL:https://events.ril.fi/en/events/ai-in-aec.html
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:digital-construction-asia-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270317
DTEND;VALUE=DATE:20270319
SUMMARY:Digital Construction Asia 2027
LOCATION:Sands Expo & Convention Centre\, Singapore\, Singapore
DESCRIPTION:An exhibition and conference on digital solutions for the built
  environment across Asia.\nhttps://www.digitalconstructionasia.com/\nStori
 a does not organize this event. Confirm details on the official site.
URL:https://www.digitalconstructionasia.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:bim-world-paris-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270331
DTEND;VALUE=DATE:20270402
SUMMARY:Digital Twin | BIM World 2027
LOCATION:Paris Expo\, Paris\, France
DESCRIPTION:The French gathering on digital innovation in construction and 
 cities: BIM\, digital twins and contech.\nhttps://www.bim-w.com/\nStoria d
 oes not organize this event. Confirm details on the official site.
URL:https://www.bim-w.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:oracle-customer-edge-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270405
DTEND;VALUE=DATE:20270408
SUMMARY:Oracle Customer Edge Summit 2027
LOCATION:Orlando\, United States
DESCRIPTION:Oracle's customer summit for construction\, engineering and uti
 lities\, the main in-person event for Aconex and Primavera users.\nhttps:/
 /www.oracle.com/customer-edge-summit/\nStoria does not organize this event
 . Confirm details on the official site.
URL:https://www.oracle.com/customer-edge-summit/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:agc-convention-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270406
DTEND;VALUE=DATE:20270409
SUMMARY:2027 AGC Annual Convention
LOCATION:Phoenix Convention Center\, Phoenix\, United States
DESCRIPTION:The annual convention of the largest US commercial construction
  association.\nhttps://www.agc.org/future-agc-meetings\nStoria does not or
 ganize this event. Confirm details on the official site.
URL:https://www.agc.org/future-agc-meetings
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:bluebeam-unbound-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270406
DTEND;VALUE=DATE:20270409
SUMMARY:Bluebeam Unbound 2027
LOCATION:Virgin Hotels Las Vegas\, Las Vegas\, United States
DESCRIPTION:Bluebeam's user conference on document workflows\, markups\, co
 llaboration and AI from design to handover.\nhttps://unbound.bluebeam.com/
 \nStoria does not organize this event. Confirm details on the official sit
 e.
URL:https://unbound.bluebeam.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:feicon-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270406
DTEND;VALUE=DATE:20270410
SUMMARY:FEICON 2027
LOCATION:São Paulo Expo\, São Paulo\, Brazil
DESCRIPTION:Brazil's largest construction trade fair\, for manufacturers\, 
 distributors\, contractors and building professionals.\nhttps://www.feicon
 .com.br/en-us.html\nStoria does not organize this event. Confirm details o
 n the official site.
URL:https://www.feicon.com.br/en-us.html
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:asc-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270419
DTEND;VALUE=DATE:20270422
SUMMARY:63rd Annual Associated Schools of Construction International Confer
 ence
LOCATION:Oklahoma City\, United States
DESCRIPTION:The annual conference of construction management faculty and in
 dustry on research\, curricula and teaching.\nhttps://ascweb.org/about/202
 7-asc-conference/\nStoria does not organize this event. Confirm details on
  the official site.
URL:https://ascweb.org/about/2027-asc-conference/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:intermat-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270421
DTEND;VALUE=DATE:20270425
SUMMARY:INTERMAT Paris 2027
LOCATION:Paris Nord Villepinte\, Villepinte (Paris)\, France
DESCRIPTION:The triennial international show for construction equipment\, m
 aterials and techniques\, with World of Concrete Europe.\nhttps://www.inte
 rmatconstruction.com/en\nStoria does not organize this event. Confirm deta
 ils on the official site.
URL:https://www.intermatconstruction.com/en
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:scl-eastern-europe-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270422
DTEND;VALUE=DATE:20270424
SUMMARY:2nd Eastern European Regional SCL Conference
LOCATION:Sofia\, Bulgaria
DESCRIPTION:A regional construction law conference bringing together the Ea
 stern European SCL societies.\nhttps://bscl.bg/en/2nd-eastern-european-reg
 ional-scl-conference-in-sofia-2/\nStoria does not organize this event. Con
 firm details on the official site.
URL:https://bscl.bg/en/2nd-eastern-european-regional-scl-conference-in-sofi
 a-2/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:project-control-summit-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270423
DTEND;VALUE=DATE:20270426
SUMMARY:Project Control Summit 2027
LOCATION:The Ritz-Carlton Dallas\, Las Colinas\, Irving (Dallas)\, United S
 tates
DESCRIPTION:A conference for project controls and delivery professionals on
  scheduling\, cost and performance.\nhttps://projectcontrolsummit.com/\nSt
 oria does not organize this event. Confirm details on the official site.
URL:https://projectcontrolsummit.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:revizto-made-right-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270427
DTEND;VALUE=DATE:20270429
SUMMARY:Made Right Conference 2027
LOCATION:Boston\, United States
DESCRIPTION:Revizto's conference for BIM coordination\, VDC and project del
 ivery teams.\nhttps://maderight.revizto.com/\nStoria does not organize thi
 s event. Confirm details on the official site.
URL:https://maderight.revizto.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:enr-futuretech-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270504
DTEND;VALUE=DATE:20270506
SUMMARY:ENR FutureTech 2027
LOCATION:Hilton San Francisco Union Square\, San Francisco\, United States
DESCRIPTION:ENR's construction technology forum\, where contractors\, owner
 s and technology leaders discuss AI and data.\nhttps://www.enr.com/future-
 tech\nStoria does not organize this event. Confirm details on the official
  site.
URL:https://www.enr.com/future-tech
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:expo-construir-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270505
DTEND;VALUE=DATE:20270507
SUMMARY:Expo Construir 2027
LOCATION:Hilton Buenos Aires\, Buenos Aires\, Argentina
DESCRIPTION:An Argentine B2B construction event with exhibitors and talks f
 or developers\, builders\, architects and suppliers.\nhttps://expoconstrui
 r.com/\nStoria does not organize this event. Confirm details on the offici
 al site.
URL:https://expoconstruir.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:vrca-clf-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270506
DTEND;VALUE=DATE:20270509
SUMMARY:VRCA Construction Leadership Forum 2027
LOCATION:Fairmont Chateau Whistler\, Whistler\, Canada
DESCRIPTION:A three-day forum for British Columbia's construction leaders o
 n industry challenges\, trends and practice.\nhttps://vrca.ca/clf/\nStoria
  does not organize this event. Confirm details on the official site.
URL:https://vrca.ca/clf/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:expoconstruccion-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270511
DTEND;VALUE=DATE:20270517
SUMMARY:Expoconstrucción y Expodiseño 2027
LOCATION:Corferias\, Bogotá\, Colombia
DESCRIPTION:Colombia's biennial construction and design fair\, for contract
 ors\, architects\, developers and material suppliers.\nhttps://expoconstru
 ccionyexpodiseno.com/\nStoria does not organize this event. Confirm detail
 s on the official site.
URL:https://expoconstruccionyexpodiseno.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:futurebuild-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270511
DTEND;VALUE=DATE:20270514
SUMMARY:Futurebuild 2027
LOCATION:ExCeL London\, London\, United Kingdom
DESCRIPTION:A built environment exhibition and conference on sustainable co
 nstruction\, alongside UK Construction Week London.\nhttps://www.futurebui
 ld.co.uk/\nStoria does not organize this event. Confirm details on the off
 icial site.
URL:https://www.futurebuild.co.uk/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:construmat-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270518
DTEND;VALUE=DATE:20270521
SUMMARY:Construmat 2027
LOCATION:Fira de Barcelona\, Gran Via\, Barcelona\, Spain
DESCRIPTION:Barcelona's construction show and professional congress\, for a
 rchitects\, contractors\, engineers and suppliers.\nhttps://www.construmat
 .com/\nStoria does not organize this event. Confirm details on the officia
 l site.
URL:https://www.construmat.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ukreiif-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270518
DTEND;VALUE=DATE:20270521
SUMMARY:UKREiiF 2027
LOCATION:Royal Armouries Museum and New Dock\, Leeds\, United Kingdom
DESCRIPTION:The UK real estate investment and infrastructure forum\, for de
 velopers\, investors\, public bodies and contractors.\nhttps://2027.ukreii
 f.com/\nStoria does not organize this event. Confirm details on the offici
 al site.
URL:https://2027.ukreiif.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:big5-saudi-may-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270524
DTEND;VALUE=DATE:20270528
SUMMARY:Big 5 Construct Saudi 2027 (May edition)
LOCATION:Riyadh Front Exhibition & Conference Center\, Riyadh\, Saudi Arabi
 a
DESCRIPTION:Saudi Arabia's largest construction show. This edition covers a
 rchitecture and finishes.\nhttps://www.big5constructsaudi.com/\nStoria doe
 s not organize this event. Confirm details on the official site.
URL:https://www.big5constructsaudi.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:drbf-sydney-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270526
DTEND;VALUE=DATE:20270529
SUMMARY:DRBF International Conference Sydney 2027
LOCATION:Amora Hotel Jamison Sydney\, Sydney\, Australia
DESCRIPTION:DRBF's flagship international conference on dispute boards and 
 dispute avoidance.\nhttps://www.drbf.org/events\nStoria does not organize 
 this event. Confirm details on the official site.
URL:https://www.drbf.org/events
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:pce-uae-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270601
DTEND;VALUE=DATE:20270604
SUMMARY:Project Controls Expo UAE 2027
LOCATION:Grand Hyatt Conference & Exhibition Centre\, Dubai\, United Arab E
 mirates
DESCRIPTION:The Middle East edition of the project controls expo\, for plan
 ners and cost engineers on Gulf megaprojects.\nhttps://projectcontrolexpo.
 com/dubai\nStoria does not organize this event. Confirm details on the off
 icial site.
URL:https://projectcontrolexpo.com/dubai
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:aace-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270613
DTEND;VALUE=DATE:20270616
SUMMARY:2027 AACE International Conference & Expo
LOCATION:Hyatt Regency Orlando\, Orlando\, United States
DESCRIPTION:The cost engineering and project controls conference\, with tec
 hnical sessions on scheduling\, forensic delay analysis and claims.\nhttps
 ://web.aacei.org/conferences-events/events/conference-expo-information/202
 7ConEx\nStoria does not organize this event. Confirm details on the offici
 al site.
URL:https://web.aacei.org/conferences-events/events/conference-expo-informa
 tion/2027ConEx
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:csce-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270616
DTEND;VALUE=DATE:20270619
SUMMARY:CSCE 2027 Annual Conference
LOCATION:Hyatt Regency Calgary\, Calgary\, Canada
DESCRIPTION:The Canadian civil engineering conference\, with nine specialty
  tracks including construction.\nhttps://www.csce2027calgary.ca/\nStoria d
 oes not organize this event. Confirm details on the official site.
URL:https://www.csce2027calgary.ca/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dcw-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270623
DTEND;VALUE=DATE:20270625
SUMMARY:Digital Construction Week 2027
LOCATION:ExCeL London\, London\, United Kingdom
DESCRIPTION:The UK's main digital construction show\, on BIM\, AI\, digital
  twins and contech.\nhttps://www.digitalconstructionweek.com/\nStoria does
  not organize this event. Confirm details on the official site.
URL:https://www.digitalconstructionweek.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:isarc-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270628
DTEND;VALUE=DATE:20270702
SUMMARY:ISARC 2027\, 44th International Symposium on Automation and Robotic
 s in Construction
LOCATION:Odense\, Denmark
DESCRIPTION:The leading symposium on automation\, robotics and digital tech
 nology in construction.\nhttps://www.iaarc.org/isarc-2027\nStoria does not
  organize this event. Confirm details on the official site.
URL:https://www.iaarc.org/isarc-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ec3-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270711
DTEND;VALUE=DATE:20270715
SUMMARY:EC³ 2027\, European Conference on Computing in Construction
LOCATION:Thessaloniki\, Greece
DESCRIPTION:Europe's main research conference on computing in construction\
 , preceded by the EC³ Summer School.\nhttps://ec-3.org/conference/c2027/\
 nStoria does not organize this event. Confirm details on the official site
 .
URL:https://ec-3.org/conference/c2027/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:innovation-resilient-futures-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270711
DTEND;VALUE=DATE:20270715
SUMMARY:Innovation for Resilient Futures 2027
LOCATION:Fortaleza\, Brazil
DESCRIPTION:A CIB conference on smart\, sustainable and resilient cities fo
 r researchers\, industry and policymakers.\nhttps://cibworld.org/innovatio
 n-for-resilient-futures-2027/\nStoria does not organize this event. Confir
 m details on the official site.
URL:https://cibworld.org/innovation-for-resilient-futures-2027/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:construction-law-summer-school-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270906
DTEND;VALUE=DATE:20270911
SUMMARY:Construction Law Summer School 2027
LOCATION:Downing College\, University of Cambridge\, Cambridge\, United Kin
 gdom
DESCRIPTION:A residential week on international construction and engineerin
 g law for lawyers\, engineers and contract managers.\nhttps://informaconne
 ct.com/construction-law-summer-school/\nStoria does not organize this even
 t. Confirm details on the official site.
URL:https://informaconnect.com/construction-law-summer-school/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:autodesk-university-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270914
DTEND;VALUE=DATE:20270917
SUMMARY:Autodesk University 2027
LOCATION:Las Vegas\, United States
DESCRIPTION:Autodesk's annual design and make conference for architecture\,
  engineering and construction teams.\nhttps://conferences.autodesk.com/flo
 w/autodesk/au2026/webphase4/page/overview\nStoria does not organize this e
 vent. Confirm details on the official site.
URL:https://conferences.autodesk.com/flow/autodesk/au2026/webphase4/page/ov
 erview
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:cii-fall-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270915
DTEND;VALUE=DATE:20270918
SUMMARY:CII Fall 2027 Conference
LOCATION:Denver\, United States
DESCRIPTION:Owners\, contractors and university researchers share findings 
 on capital project delivery.\nhttps://www.construction-institute.org/\nSto
 ria does not organize this event. Confirm details on the official site.
URL:https://www.construction-institute.org/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:big5-saudi-september-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270919
DTEND;VALUE=DATE:20270923
SUMMARY:Big 5 Construct Saudi 2027 (September edition)
LOCATION:Riyadh Front Exhibition & Conference Center\, Riyadh\, Saudi Arabi
 a
DESCRIPTION:Saudi Arabia's largest construction show. This edition covers c
 onstruction and building services.\nhttps://www.big5constructsaudi.com/\nS
 toria does not organize this event. Confirm details on the official site.
URL:https://www.big5constructsaudi.com/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:scli-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20270929
DTEND;VALUE=DATE:20271002
SUMMARY:SCLI 2027\, 12th International Society of Construction Law Conferen
 ce
LOCATION:Sava Centar\, Belgrade\, Serbia
DESCRIPTION:The biennial world conference of the construction law societies
 \, for lawyers\, arbitrators\, experts and engineers.\nhttps://scli2027.or
 g/\nStoria does not organize this event. Confirm details on the official s
 ite.
URL:https://scli2027.org/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:cmaa-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20271010
DTEND;VALUE=DATE:20271013
SUMMARY:CMAA2027 National Conference & Trade Show
LOCATION:Dallas-Fort Worth\, United States
DESCRIPTION:CMAA's annual conference and trade show for construction and pr
 ogram managers\, owners and consultants.\nhttps://www.cmaanet.org/conferen
 ces\nStoria does not organize this event. Confirm details on the official 
 site.
URL:https://www.cmaanet.org/conferences
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:pgcs-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20271012
DTEND;VALUE=DATE:20271015
SUMMARY:Project Governance and Controls Symposium 2027
LOCATION:Hotel Realm\, Canberra\, Australia
DESCRIPTION:An Australian symposium on project governance and controls for 
 government\, defence and industry.\nhttps://consec.eventsair.com/pgcs-2026
 /\nStoria does not organize this event. Confirm details on the official si
 te.
URL:https://consec.eventsair.com/pgcs-2026/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:lci-congress-2027@storiatechnologies.com
DTSTAMP:20261002T000000Z
DTSTART;VALUE=DATE:20271025
DTEND;VALUE=DATE:20271029
SUMMARY:29th Annual Lean Construction Institute Congress
LOCATION:Long Beach\, United States
DESCRIPTION:The largest US lean design and construction gathering\, for own
 ers\, designers\, contractors\, trade partners and researchers.\nhttps://c
 ongress.leanconstruction.org/\nStoria does not organize this event. Confir
 m details on the official site.
URL:https://congress.leanconstruction.org/
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
