Skip to main content

Privacy

A note about cookies

Essential cookies keep this site running. Optional analytics help us understand what's working, only enabled if you accept.

About Storia

The team behind your project's clarity.

A small, focused team in Montréal, building for the people who carry the weight of complex construction projects.

Storia · AboutLetter · 2026

A note from our CEO.

For two decades at Creo Solutions, we've sat across the table from general contractors, owners, and counsel. We've watched the same scene repeat itself, project after project. The answer is in the record. Nobody has time to find it.

Storia is our response. It reads what every team already has, RFIs, change orders, schedules, daily logs, field reports, contracts, and gives back a searchable record of the project. Decisions, not delays. Evidence on demand. Narratives backed by source.

We're a Montréal team building this for the people who carry the weight. If that's you, talk to us.

Enzo ConteCEO

01 / Why we exist

Every project contains the intelligence needed to resolve its own disputes and answer its own questions.

Our job is to surface it.

02 / Principles

Ten principles. Zero slogans.

  1. 01Ownership at every levelAct like a founder
  2. 02Bias for actionMove, then refine
  3. 03Deliver quickly, iterate relentlesslyShip, then improve
  4. 04Think customer-firstValidate through users
  5. 05Raise the bar, every timeNever settle
  6. 06Simplify the complexClarity over cleverness
  7. 07Data-informed, not data-paralyzedAnalysis fuels action
  8. 08Collaborate with trustChallenge ideas, not people
  9. 09Earn trust through transparencySay what's true
  10. 10Think big, build smartBold ideas, grounded steps
03 / Facts

Where we come from.

  • Montréal, QuébecWhere the team works
  • Creo SolutionsParent company of Storia
  • Two decadesAt Creo Solutions, across the table from contractors, owners and counsel
  • Technologies CREOlyticThe company behind Storia

Supported by

  • Oracle
  • NSERC
  • Mitacs
  • Concordia University
  • PROMPT
04 / With Concordia

A working session with the lab.

A researcher at the projection screen points at a diagram while the room, seated at curved tables, watches.
Walking through a matching result
A panel-style conversation: several people seated at the front of the seminar room, facing the others.
Researchers and the Storia team
A close conversation across the table, with one person in the foreground listening.
Questions from the lab
A wide view of the seminar room as people arrive and take seats at the curved tables, slides on the screen.
Working session, Concordia University
Students at laptops around the curved tables, following the slides on the projector.
Following along
The room faces the projection screen during a presentation of results.
Results on screen

See the research →

Work with us, or come work here.

About · Storia