Claims & Dispute Resolution

Avoid the claim.
Or build it in days.

Storia builds the project narrative as the job runs. Settle on facts, or turn that same record into a claim draft in days.

  • Source-linked
  • Built while the project runs
  • Editable by your expert

One project record

Two outcomes, off the same evidence.

Claim CCD-014 · Meridian HeightsAssembling as the job runs
RFIs · daily reports · schedule · correspondenceOne record

Track AResolve

  • 01Site event logged, opening B-12 flagged
  • 02RFI 142 raised against revision C
  • 03Four-party coordination on the thread

Closed on factsResolved

Track BBuild the claim

  • 01Evidence assembled from the same record
  • 02Critical-path impact quantified
  • 03Narrative drafted, every point cited

Draft in handDay 7

The shift

Collation is the part that costs you months.

7daysDrafted

to a claim-ready narrative, where assembly typically runs six to twelve weeks.

Sample draft · CCD-014

18exhibitsCited

labelled, page-cited and linked across a 42-page draft, with no uncited paragraphs.

Sample draft · CCD-014

One platform, two stages

Same record, same engine. Applied where your project is.

01 / 02 · Pre-claim

Close disputes on facts.

Trace cause and effect across RFIs, change orders and schedule before anything escalates.

  • Issues resolved in the open
  • Manual retrieval cut to near zero
  • Weeks of fact-finding become minutes
Time to assemble the factsPre-claim
Without StoriaWith Storia

Assembling the facts

Weeks of retrieval across four systems.

Minutes. Traceability is built in.

What you bring to the meeting

Opinions and a partial document set.

A linked timeline anyone can verify.

Where it ends

Delay, then escalation.

Timely resolution.

02 / 02 · Claim build-out

When resolution isn’t possible.

The same record becomes a claim-ready narrative with the evidence and timeline attached.

  • Event chain and impact built from the record
  • Every paragraph cited to its page
  • Refines as the record keeps growing
Narrative draft · CCD-014Working draft
6–12 weeks7 days
Asserted impact$1.40M
Critical-path delay34 days
Timeline events14
Linked sources25

All sources linked · ready to refine

The deliverable

A claim narrative, drafted.

It arrives looking like your firm produced it.

Cover, branding and case metadata are generated from the record, and the whole document is marked as a working draft so nobody mistakes it for a filing.

Auto-branded cover · 42 pages · 18 exhibits

CCD-014_Critical_Path_Delay_Claim.pdfCover

Storia · Meridian Heights

Claim Narrative:
Critical-Path Delay
ClaimCCD-014
PeriodApr – Aug 2024
Asserted impact$1.40M
Critical-path delay34 days

Working draft · for expert review09/04/24

A structured first draft. Not a filing.

Book a 20-minute walkthrough

Why one platform

The record you build to avoid a claim is the record that wins it.

01

Same record, both stages

The evidence gathered to resolve a dispute is the same evidence that supports the claim if resolution fails. No re-discovery, no reconstruction from memory.

02

Built while the project runs

Support is compiled as the work happens, not months later, once the people involved have moved on and the trail has gone cold.

03

Source-linked by design

Every point in the narrative ties back to its underlying evidence, so your team and the opposing side can both verify it, and challenge it.

The toolkit

Built on the capabilities your team already needs.

IntelligenceImpact map

Links issues across documents, communications, cost and schedule, and traces the evidence behind every connection.

IntelligenceAssistant

Answers questions from the project record, surfacing the supporting documents alongside the facts and risks.

IntelligenceIssue Explorer

Groups related documents, events and stakeholders into one view, so history is reviewed without opening files one by one.

ClaimDelay analysis

Ties schedule updates to their source records: what changed, when it was known, and what it did to the critical path.

ClaimClaim center

Substantiates claims during the project: generates claim events, organises records, and keeps the package current.

DiscoverySearch

Centralises the data your team already produces, for keyword search and precise document retrieval.

Delay analysis runs deeper on its own page.

See Schedule Intelligence

Two entry points

Bring proof to the next meeting. Or to the claim file.

If you’re facing a dispute

Settle it on the record.

Send us the project data and we’ll return a linked timeline you can put in front of the other side.

Book a demo

If you’re building a claim

Start from a draft.

Same submission, different destination: a cited narrative with the evidence and timeline already attached.

Book a demo
  • Same destination
  • Same record
  • Same team

On your own record

Send us the project. We’ll send back the story.

Bring the documents you already have. In twenty minutes we’ll walk you through the timeline we assembled from them, and tell you honestly whether you have a claim or a conversation.