The claims & dispute platform

Avoid the claim.
Or build it in days.

Storia builds the project narrative as the work happens, so teams can resolve disputes in coordination, and when resolution isn't possible, move from records to a claim-ready narrative in days.

ONE PROJECT RECORDTWO OUTCOMESTwo outcomes from one project recordA horizontal timeline that branches at a decision point. The top track ends in resolution during coordination. The bottom track ends in a claim narrative drafted on day seven.PROJECT RECORDCCD-014RFIs · daily reports · scheduledecisionTRACK A · RESOLVED IN COORDINATIONsite eventRFIcoordinationresolvedTRACK B · CLAIM NARRATIVEevidenceimpactnarrativeday 7

One platform, two stages

Same record. Same engine. Applied at the stage your project is in.

Stage 01 · Pre-claim

Resolve in coordination.

Trace cause and effect across RFIs, change orders, and schedule before the dispute escalates.

Weeks of fact-finding → minutes
Stage 02 · Claim build-out

Narrative in days.

Turn the same project record into a claim-ready narrative with linked evidence and timeline.

6–12 weeks → 7 days

Stage 01 · Pre-claim

Close disputes based on facts.

DimensionWithout StoriaWith Storia
Time to assemble factsWeeks. Manual retrieval of documents.Minutes. Traceability and reconstruction built in.
What you bring to the meetingOpinions and partial documentation.A traceable linked timeline.
Where it usually endsDelays and escalation.Timely resolution.
Most disputes can be resolved through clarity. The ability to trace and reconstruct allows for speedy resolutions.
Resolve scope and coordination issues.
Reduce manual manpower effort.
Fact-based decisions.
Facing a dispute now? Book a demo →

Stage 02 · Claim build-out

Cut weeks off every narrative.

The shift that defines Stage 02Narrative draft · CCD-014
Typical claim assembly6–12 wks
With Storia7 days

A working narrative, drafted from your project record with evidence already linked.

Asserted impact$1.40M
Critical-path delay34 days
Timeline events14
Source documents linked25

The deliverable

A claim narrative, drafted.

A structured first draft — not a counsel-ready filing. Storia assembles the chain of events, evidence, and impact so your claim experts skip the blank page and spend their time refining, not collating.

CCD-014_Critical_Path_Delay_Claim.pdf42 pages · 18 exhibits
Storia · Meridian Heights
Claim Narrative — Critical-Path Delay
Claim · CCD-014
Period · Apr – Aug 2024
Asserted impact · $1.40M · 34 days
Working draft · for expert review09/04/24
Cover · auto-branded
Section 02

Table of contents

Executive summaryp. 3
Chain of eventsp. 5
Critical-path analysisp. 14
Cost impactp. 20
Exhibit A · Daily Logsp. 24
Exhibit B · RFI #142p. 28
Exhibit C · Email threadp. 32
Exhibit D · Schedule v06p. 36
Exhibit E · COR-019p. 40
TOC · auto-paginated
Section 03 · Page 5

Chain of events.

On 2024-08-09 the glazing crew was released for weather. The same daily log noted opening B-12 would need to be re-measured the following MondayA·1. No RFI had yet been written.

Three days later, RFI #142 was filed: unitized panel revision C did not match the as-built opening at B-12B·1. The RFI was flagged "blocks closeout."

Architect review followed in a four-party email thread on 2024-08-14, with a hold placed on unitized lot 4C·2. The revised shop drawing arrived eight days later.

Citations · A·1 Ex. A p.1 · B·1 Ex. B p.1 · C·2 Ex. C p.2
Body · page-cited
Branded coverAuto TOCPage-cited narrativeLabeled exhibitsEditable by your claim expertRefines as the record grows

Why one platform

The record you build to avoid a claim is the record that wins it.

01

Same record, both stages

The evidence assembled to resolve a dispute is the same evidence that builds the claim if resolution fails. No re-discovery. No reconstruction.

02

Built while the project runs

Storia builds claim support as the work happens, not months later, when the people who lived it have moved on and the trail has gone cold.

03

Source-linked by design

Every narrative point connects back to the underlying evidence. Your team can verify, challenge, and refine. So can the other side.

Two entry points

Bring proof to the next meeting. Or to the claim file.

Give Storia your project data. Get back a narrative with linked evidence, ready for your team to act on.

Same destination · Same record · Same team
Construction Claims & Dispute Resolution Platform · Storia