The claim platform

Cut weeks off every narrative.

Storia turns scattered project records into a defensible claim narrative, linking evidence, building timelines, and structuring the claim package so your project team can move from discovery to action faster.

  • Source-linked drafts
  • NDA on day one
  • Your team stays in control

Time to a working narrative

Typical

6–12 weeks

With Storia

7 days

Drafted from your records by the platform. Your claim team picks it up and refines.

  • Built for project teams

    Storia helps the people closest to the work surface the records, events, and context that claims depend on.

  • Source-linked by design

    Every narrative point connects back to the underlying evidence, so teams can verify, challenge, and refine the output.

  • Claims that grow with the project

    Build claim support while the project is still active, instead of reconstructing the story months later.

  • Your records stay yours

    Your project records remain yours. Storia handles them under NDA and does not use them to train shared models.

The gap

Your project already has the evidence. It just isn’t assembled.

Construction teams capture the record every day through schedules, RFIs, daily reports, photos, costs, changes, and correspondence. But when a claim appears, that record is fragmented. Teams spend weeks digging through documents, rebuilding timelines, and connecting facts to support. Storia closes the gap by turning scattered project records into claim-ready evidence, so legitimate cost does not disappear simply because the proof is too hard to assemble.

6–12 weeks

to assemble delay evidence manually

$300–500/hr

for delay and claim support

Millions

in legitimate entitlement left on the table

The scenario

From a missed RFI to a claim-ready narrative in 7 days.

A delayed RFI response created a cascading schedule impact. Within one week, Storia assembled the supporting record, quantified the exposure, and produced a working narrative for the claim team.

Case timeline

  1. Day 1

    $0

    RFI submitted

    No cost impact identified yet.

  2. Day 10

    $0

    Response window missed

    The contractual response period was exceeded, creating a potential entitlement issue.

  3. Day 34

    $1.15M

    Critical-path delay identified

    Idle time accumulated at approximately $48K/day, bringing the documented exposure to $1.15M.

  4. Day 41

    $1.40M

    Claim narrative drafted

    Storia delivered a working draft with linked source records, supporting the claim team’s review and refinement.

What your team receives after 7 days

A structured claim narrative drafted from the project record, with linked source documents and timeline evidence already assembled.

  • $1.40M documented
  • 7 days vs. 6–12 weeks
  • ~80% assembly time saved

Narrative draft · CCD-014

Day 7

Asserted impact

$1.40M

Basis of impact

34-day critical-path delay, drafted from project records.

Evidence assembled

  • 14

    Timeline events

  • 3

    RFIs and responses

  • 22

    Daily reports linked

  • 34 days

    Schedule impact

All sources linked · ready for your claim team to refine

v1.0

Why it matters

Free your project managers to manage projects, not chase evidence.

  • Reclaim the time PMs lose digging through RFIs, daily reports, meeting minutes, schedules, and emails.
  • Stop choosing between staying ahead of the work and reconstructing what happened after the fact.
  • Give project leaders more time for coordination, decision-making, risk management, and keeping the job moving.

Claims Management

Give your project team weeks back.

Is your project facing disputes or heading toward a claim? Give Storia the project data to produce narratives with linked evidence ready for your team to review, refine, and act on.