Search & Link.Tell a story. Resolve.

Every delay, with its cause, its impact and a claim report ready to send.

Storia · Line B--:--
SecurityData separationData residencySSO & RBACAES-256 encryptionSecurity & trust

Supported by

Four products, one record

Each one reads the same source-linked record.

02 / 04 · Schedule Intelligence

Every delay, explained.

Not just what slipped: the decision, document and date that caused it.

  • Baseline vs. current, every update
  • Slippage traced to the decision that caused it
  • Critical-path & float impact, evidenced
View Schedule Intelligence
Delay analysis · Schedule #6Compared

Schedule #6 · Aug 16, compared to prior baseline of May 16

BaselineCurrentCritical slip
Install ductwork
+7d
Install HVAC units
+20d
Connect ventilation
+20d

Window delay0d

Finish date unchanged this window.

Float erosion−7d

Buffer lost on critical path: 6 activities flagged.

Cause & effectTraced

2.7.1 → RFI-218 · 14d open → CD-07 issued

03 / 04 · Claims & Dispute Resolution

Built for claims experts.

The chronology assembles itself from the record, so your expert argues instead of hunting.

  • Chronology assembled from the record automatically
  • Every event linked to its source document
  • Evidence packs your experts build the claim on
View Claims & Dispute Resolution
Claim · East abutment delayFor review

Chronology7 events

RFI-218 raised: rebar conflict↳ RFI-218.pdf
Forming crew stood down↳ Daily log 05-12
CD-07: revised detail issued↳ CD-07.pdf

Evidence packLinked

ARFI-218: rebar conflictPDF · p2
BDaily log: crew stood down05-12
CCD-07: revised detailPDF · p1

3 exhibits · 0 gaps · ready for expert

04 / 04 · Documents Hub & Ask Storia

Every source, unified. Then answerable.

Storia reads and types every file on ingest, maps it into the record, and lets one assistant answer across all of it with citations.

  • Connects PMIS, schedulers, email, and files
  • Reads and types every source on ingest
  • Answers cited back to the source document
View Documents Hub
Documents Hub · IngestReading
Unifying 6 sources · 312 files244 / 312
RFI-218_rebar_conflict.pdfvia Procore · RFI
A-204_abutment_detail_rev3.dwgvia ACC · Rev 3
Ask StoriaLine B · 4,182 documents

Why did the east abutment pour slip, and who’s accountable?

The 9-day slip traces to an unresolved rebar conflict RFI-218, which stood the forming crew down Log 05-12 until a revised detail was directed CD-07. The delay sits on the critical path, and the cost position remains open.

Integrations

Every source. One system of record.

Storia connects to the tools your project already runs on (PMIS, schedulers, email, and the files you already have) and unifies them into one source-linked record.

10 sources Unified into one source-linked record

Backed by

CREO Solutions

An Oracle Certified Partner for Construction & Engineering.

CREO selects, deploys, and integrates the Oracle Construction & Engineering product line across the project lifecycle, on major infrastructure, institutional, and industrial programs.

AconexPrimavera P6 / OPCUnifier

Talk to the team

Book a 30-minute walkthrough.

See how Storia turns your project record into answers, evidence, and narratives, on your own documents.

Book a demo