Skip to main content

Privacy

A note about cookies

Essential cookies keep this site running. Optional analytics help us understand what's working, only enabled if you accept.

Oracle Aconex integration

Claimable events, posted into Aconex.

Mail, RFIs, revisions and workflows already file the record a claim gets built from. Storia reads that project through Oracle’s own API, surfaces the events that may become claimable as they build up, and posts what it finds back as native Aconex mail.

  • Mail, register and workflows
  • Native Aconex write-back
  • Nothing migrated

All integrations →

Oracle Aconex · Cedarline Research CentreSample project

MailRegisterWorkflowsRead in place

  1. RFIRFI-088 · roof exhaust routing104 d unanswered
  2. CorrespondenceMAIL-04471 · handover movedNo workflow raised
  3. DrawingDWG-M-401 rev. BReferenced
  4. DrawingDWG-M-204 rev. CDetail not carried
  5. CorrespondenceMAIL-04519 · handover moved again28 Oct
STO-ANL-00087 · mail type AnalysisStoria analysis, week of 27 OctPosted back

3 events surfaced · native Aconex mail · nothing migrated

Inside the mailbox

What Storia finds goes back where it was found.

Project · Cedarline Research CentreMail

Mail / STO-ANL-00087 · mail type Analysis

Storia analysis, week of 27 Oct

From
Storia
To
Owner rep, contractor, design team
Sent
03 Nov 2026 · 07:00
  1. 01
    Event surfacedRFI-088 unanswered for 104 days.

    Raised 21 Jul on the roof exhaust routing. The last movement was an acknowledgement; nothing has been filed since. The roof plant sequence is waiting on it.

    May support a time claimUnreviewed

    • MailRFI-088 · 21 Jul
    • Thread6 mails
    • DocumentDWG-M-401 rev. B
  2. 02
    Event surfacedLevel 3 lab handover moved twice by mail.

    Moved on 14 Oct and again on 28 Oct, both times in correspondence. No workflow was raised, so the register carries no record of the move.

    May support an access claimUnreviewed

    • MailMAIL-04471 · 14 Oct
    • MailMAIL-04519 · 28 Oct
    • WorkflowNone raised
  3. 03
    Event surfacedHVAC detail instructed by mail after rev. C was issued.

    A revised detail was instructed on 21 Oct. DWG-M-204 rev. C does not carry it, and the event log shows no reissue.

    May support a change claimUnreviewed

    • MailMAIL-04502 · 21 Oct
    • DocumentDWG-M-204 rev. C
    • Event logNo reissue
Illustrative rendering of the posted mail, not a screenshot. Aconex’s screen shown generically. Sample project and example values.
How it works

Three moves, and the record never leaves Oracle.

  1. 01 · Read

    Read the project through Oracle’s API.

    Bound to an Oracle user you nominate, so Storia sees exactly what that user sees: mail and RFIs, the register and its event log, workflows and the directory, threads in order, with attachments.

    Connection · per project
  2. 02 · Surface

    Surface the events that may become claimable.

    RFIs going unanswered, dates moved by mail with no workflow raised, scope instructed after a revision was issued. Each event is held against the record it came from.

    Output · traced events
  3. 03 · Post back

    Post the analysis back as native Aconex mail.

    Once a period, into the project and mail type you choose, to recipients from the Aconex directory. A back-reference to the source means it is never posted twice.

    Surface · native mail
The boundary

The record stays in Oracle Aconex. Nothing is migrated.

Oracle Aconex · holds the record
Mail, RFIs and transmittals
Searched by date and by field, threads in order with attachments.
Register, revisions and workflows
Metadata, marked-up PDFs and the event log: who acted, from which organisation, on which revision.
Reads continuously
Storia · analysis only
Surface claimable events
Read across the thread and the register, each event traced to its source record.
One mail back per period
A native Aconex mail of a dedicated type, with structured references in named custom fields.
Posts once a period

Reads in place · surfaces the events · posts one mail back · nothing migrated

Side by side

Same Aconex. Different visibility.

Aconex aloneAconex with Storia
Finding the evidenceThe record is complete and correct. Someone still has to read six weeks of mail to find the three events that matter.The events that may become claimable are surfaced as they build up, each traced to its mail, revision or workflow.
When you lookAt claim time, months later, working back from an outcome.Weekly, while the thread is still moving and the answer can still be chased.
Where the analysis livesIn whatever dashboard or spreadsheet produced it.In the project, as native Aconex mail, visible and auditable to everyone on the job.
What movesNothing.Nothing. Aconex stays the source of truth.
Connected per project

Bound to one Oracle user. Scoped to one project.

Data flow
Aconex keeps the record. Storia reads in place and posts back.
Reads
Mail, RFIs, transmittals, the register, revisions, workflows and the directory.
Writes
One native mail per period, of a mail type you choose.
Migrated
Nothing. The project stays in Aconex.
Setup
Nominate an Oracle user, choose the project and the mail type.
Oracle Aconex integration

See it on your own Aconex project.

Thirty minutes on one project. We read it with the user you nominate, and the first analysis mail lands in that project.

Oracle Aconex integration · Storia