Cross-system project reporting
Your control over a project depends on what your reports tell you. Storia’s reporting connects data across your PMIS, schedule and email, and shows the downstream impact before it hits.
Traced across 4 systems · in your next progress report
Then canned exports, one system at a time, tied together by hand. Storia does that work for you.
An RFI, a directive, a decision in a meeting, a schedule update. As it happens, on every project.
Your PMIS, email, minutes, contracts and schedule, linked into one audit trail across systems.
Open items laid over the baseline, so you see what they will cost downstream before they do.
Three reports clients rely on today, built from the record you already keep.
Progress report · CRC-01
Red. The project is 73 days behind baseline. An owner decision, late design detail and slow contractor reviews hold the gap.
| Key takeaways | Finding |
|---|---|
| Decisions are the critical path | CR-014, Level 3 lab layout change, has waited 108 days for an owner decision. The lab wing IFC package cannot close without it.1 |
| Reviews are slipping on the contractor side | Contractor reviewers returned 41% of documents on time over 12 weeks. 9 documents are held past their due date.2 |
Fourteen pages on one fictional project, with the notes behind every number.
We send the PDF to this address.
Get more out of the Aconex or Procore you already pay for. Storia reads the record where it lives and files the reports back there; it never replaces them.
Your reports, your meeting rhythm, your contract.
Your PMIS, schedule and email: Oracle Aconex or Procore, Primavera P6 or MS Project, Outlook and SharePoint.
Reports arrive inside your tools. No new tool to learn.
Bring documents from a current job. We'll show you what's in them, delivered into the tools you use.