Saltar al contenido principal

Privacidad

Tu privacidad

Las cookies esenciales mantienen este sitio en funcionamiento. Los análisis opcionales nos ayudan a comprender qué funciona y solo se habilitan si usted acepta.

Documents Hub

Where the record begins. Typed, mapped, searchable.

Upload the files you already have. Storia reads every page, scans included, types each file and maps it, so it is searchable in a second and ready for your reports.

  • PDF, MPP and Excel in
  • Every page read, scans included
  • Every value opens its page
Centro de documentos · Cedarline Research CentreProyecto de muestra
Suelte PDF, MPP o Excel6 archivos
  1. PDFRFI-212 Exhaust fan substitutionRFI
  2. PDFCO-031 Exhaust fan substitutionChange order
  3. MPPSchedule update 22 AprSchedule
  4. PDFDIR-07 Hold on air handling unitsDirective
  5. PDFOwner rep, Re: CR-014Reading
  6. XLSXLab wing cost impactQueued

468 documentos leídos · buscables ya · alimentan 3 informes

Cómo se integra

Files in. A typed record out. Reports from it.

Files arrive in the formats you have. Each one is read, typed and mapped, becomes searchable, and feeds your reports.

Progress report

The typed record feeds the progress report: every open decision and action, who holds it and for how many days, citing the file it came from.

  1. 01

    Open decisions and actions, by holder

  2. 02

    Days waiting, with the source file

  3. 03

    What changed since last week

Ver un informe de muestra completo →
The shift

Nobody re-keys anything again.

468documentsRead and typedon one project, with no manual re-keying at any point.Sample project · CRC-01
7fieldsMapped from one RFIeach linked back to the page it came from.RFI schema · RFI-212
01 / 02 · Type and upload

Pick what it is. Drop the files.

Each document type carries its own schema. Choose one, drop PDF, MPP or Excel, and every file is read on its own.

  • A schema behind every type
  • Files read one by one, not as a batch
  • Nothing to rename or sort
Type and uploadRFI schema
  1. Type
    RFIRFISelected
  2. pdf
    RFI-212 Exhaust fan substitutionUploaded
    Done
  3. pdf
    RFI-213 Duct clash at gridline C4Uploading
    68%
02 / 02 · Extract to schema

Every page read. Every value placed.

Storia reads the whole document, scans included, and writes the values into the record where they belong, each linked to its page.

  • Scanned pages read, not skipped
  • Values mapped into the type's schema
  • Every field opens the page it came from
RFI-212 · read7 of 7 fields
  1. Number
    RFI-212Page 1
  2. Status
    Answered · became CO-031Page 1
  3. Element
    Lab exhaust fans, Level 3Page 1
  4. Location
    Roof, gridline C4Page 2
  5. Raised by
    Firm B · mechanicalPage 1
What it reads

Every format. Every type. One reading.

Formats
  • PDF
  • MPP · MS Project
  • XLS and XLSX
Document types, live
  • RFI
  • Change order
  • Directive
  • Correspondence
  • Minutes
Document types, on the way
  • Contract
  • Specification
  • Submittal
  • Schedule
  • Drawing
Documents Hub

Bring one project's documents. Walk out with a record.

Bring the files as they are. We type them live and hand you back a structured record of your own project.

Ingestión y extracción de documentos de construcción · Storia