The Storia Library
All articles
92 articles
Sort
Extension of time72
- Prórroga de plazoUn instrumento contractual que desplaza la fecha de terminación porque las obras se retrasaron por un evento que no era riesgo del contratista, liberándolo de responsabilidad por los daños de terminación tardía. Si ese mismo…Reviewed 13 oct 2026
- Retrasos concurrentesHay retraso concurrente cuando un evento de riesgo del comitente y un evento de riesgo del contratista causan ambos el mismo periodo de sobrepaso crítico. No está resuelto en ningún ordenamiento. Sobre un mismo sobrepaso de…Reviewed 13 oct 2026
- Notice and time barsA notice clause is a time bar where the contract makes the extension of time conditional on serving notice within a stated period. Under FIDIC 2017 Sub-Clause 20.2.1 and NEC4 clause 61.3 failure forfeits entitlement outright.…Reviewed 13 oct 2026
- Métodos de análisis de retrasos comparados: cuál pueden sostener sus registrosUn método de análisis de retrasos es la técnica empleada para probar que un evento con derecho a prórroga retrasó la terminación. El SCL Delay and Disruption Protocol, 2nd Edition (February 2017) recoge en una tabla seis métodos…Reviewed 13 oct 2026
- Prolongation and delay costsAn extension of time and compensation are separate gateways: winning the time does not win the money. Prolongation cost is assessed for the period when the effect of the employer risk event was actually felt, not the overrun at…Reviewed 7 ago 2026
- Records and evidence for an EOT claimThe records a project keeps decide which delay analysis methods it can run, and that set closes long before anyone knows there is a dispute. The SCL Delay and Disruption Protocol, 2nd Edition (February 2017) names six record…Reviewed 13 oct 2026
- Modelos de aviso de retraso para AS 4000, FIDIC 2017 y CCDC 2Un aviso de retraso deja constancia a tiempo de un solo hecho: que algo ha retrasado, o retrasará, la obra, y que usted reclama el plazo. AS 4000 exige un aviso de retraso con prontitud conforme a la cl 34.2 y, después, una…Reviewed 13 oct 2026
- Cómo redactar una reclamación de prórrogaUna reclamación de prórroga de plazo prospera cuando prueba, en los propios términos del contrato y dentro de sus plazos, cuatro cosas: una causa de retraso que da derecho que no era riesgo del contratista, que esa causa retrasó…Reviewed 13 oct 2026
- Lista de verificación de la reclamación de prórrogaUna reclamación de prórroga de plazo está lista cuando una persona ajena al proyecto podría comprobar cada una de sus afirmaciones contra un registro fechado. Eso significa que hay siete elementos en su sitio: el fundamento…Reviewed 13 oct 2026
- Extension of time in QuebecIn Quebec there is no statutory completion date, no statutory extension-of-time mechanism, and no "time at large". Time is entirely a creature of contract, and when a Quebec court relieves a contractor of delay consequences it…Reviewed 8 ago 2026
- Quebec vs common-law Canada: what a common lawyer gets wrong about delayQuebec is a civil-law jurisdiction inside a common-law federation, and the delay doctrines a Canadian practitioner relies on mostly do not exist there. There is no time at large, no concurrent-delay doctrine, no imprévision and…Reviewed 8 ago 2026
- The Civil Code framework for delay in QuebecThe Code civil du Québec contains no provision on time for completion, delay or extension of time. Arts 2098–2129 were read individually. Time appears once, at art 2102, as a pre-contractual disclosure duty on the contractor.…Reviewed 8 ago 2026
- Notice and time bars in QuebecQuebec enforces contractual claim time bars strictly: a missed notice or claim deadline normally forfeits the entitlement, whatever the merits. Only three arguments defeat one: waiver, breach of the owner's obligation de…Reviewed 8 ago 2026
- Concurrent delay in QuebecQuebec has no doctrine of concurrent delay. No Quebec authority, doctrine or professional commentary on « délais concomitants » as a distinct doctrine was located. Where two causes operate on the same overrun, a Quebec court…Reviewed 8 ago 2026
- Delay penalties and the clause pénale in QuebecQuebec has no penalty versus liquidated-damages distinction. A clause pénale is valid under art 1622 C.c.Q. and enforceable without proof of loss under art 1623 para 1. The remedy is reduction, not nullity: art 1623 para 2 allows…Reviewed 8 ago 2026
- Extension of time in CanadaCanadian delay and extension-of-time law is almost entirely common law and contract. No province or territory has a statute addressing construction delay as such. On procedure Canada is close to England and strict, on remedy it…Reviewed 10 sept 2026
- Delay regimes by Canadian province: what changes at the borderNo Canadian province or territory has a statute addressing construction delay as such, so delay law is common law and contract everywhere. What changes at the border is the machinery around the claim: whether a limitation period…Reviewed 8 sept 2026
- Notice and time bars in CanadaCanadian courts enforce construction notice clauses as conditions precedent, and the owner need not prove prejudice. Under CCDC 2 – 2020 GC 6.5.4 the contractor has 10 Working Days from the commencement of the delay not from its…Reviewed 10 sept 2026
- Concurrent delay in CanadaCanadian courts treat delays as concurrent where delays to co-critical and co-controlling activities overlap, and they apportion time and money alike. On remedy that is closer to the United States than to England, which awards a…Reviewed 13 oct 2026
- Liquidated damages and the penalty rule in CanadaCanada has not adopted Cavendish Square v Makdessi. A delay liquidated damages clause is enforceable only if the rate is a genuine pre-estimate of loss, and is separately vulnerable to an unconscionability challenge. Where the…Reviewed 8 sept 2026
- Prevention principle and time at large in CanadaIn Canada an owner that has prevented the contractor from completing on time cannot insist on liquidated damages, and where no extension is granted the completion date can fall away. Perini Pacific is the anchor, but the domestic…Reviewed 10 sept 2026
- Prolongation and delay costs in CanadaCanadian law compensates delay through two routes: the contract's own reimbursement clause and damages for breach. Extended site overhead, unabsorbed head-office overhead, equipment standby and acceleration are all recoverable in…Reviewed 8 sept 2026
- Extension of time in OntarioOntario is the only Canadian jurisdiction where an extension of time is adjudicable, and the only one where a commercial contract may lawfully shorten or exclude a limitation period. Both turn on the contract date. A delay claim…Reviewed 10 sept 2026
- Ontario delay claim clocksOntario runs five independent clocks on a delay claim: contractual notice, adjudication, lien, holdback and limitation. Each has a different trigger, a different character in law and a different consequence for being missed, and…Reviewed 10 sept 2026
- Notice and time bars in OntarioIn Ontario a contractual notice of delay is a condition precedent: miss it and the claim is gone, and the owner need not prove prejudice. Content counts as much as timing. An insufficient claim submission is treated as no notice…Reviewed 10 sept 2026
- Prompt payment and adjudication in OntarioSince 1 January 2026 Ontario is the only Canadian jurisdiction where an extension of time can be adjudicated. And only as an ancillary head, only where reasonably necessary to a money determination, not on P3 projects, and not on…Reviewed 10 sept 2026
- Limitation periods and claim accrual in OntarioOntario gives a delay claim two years from discovery under the Limitations Act, 2002, with a fifteen-year long-stop. Uniquely in Canada, section 22 lets commercial parties to a business agreement extend, shorten, suspend or…Reviewed 8 ago 2026
- Liens, holdback and security for a delay claim in OntarioAn Ontario construction lien secures a delay claim only in part. The line is price versus damages: extended-duration equipment and extra labour caused by owner default are lienable. Overhead, lost profit on other jobs and general…Reviewed 10 sept 2026
- Extension of time in England and WalesEnglish law gives a contractor more time through the contract's own machinery: a Relevant Event under JCT, a compensation event under NEC4. The prevention principle is a default rule the parties can displace, concurrent delay is…Reviewed 13 oct 2026
- Concurrent delay in England and WalesIn England and Wales the working default on concurrent delay is time yes, money no: where a Relevant Event and a Contractor-risk event are both effective causes of the same critical delay, the Contractor gets a full extension of…Reviewed 13 oct 2026
- Notice and time bars in England and WalesIn English law a notice clause bars a claim only if, on its true construction, it makes the relief conditional on the notice. Disclosure and Barring Service v Tata Consultancy Services Ltd [2025] EWCA Civ 380 sets out five…Reviewed 13 oct 2026
- Prevention principle and time at large in England and WalesIn England and Wales the prevention principle is a default rule of risk allocation that clear words displace, not an overriding rule of law. An employer act that in fact delays completion sets time at large only where the…Reviewed 13 oct 2026
- Adjudicating extensions of time in England and WalesUnder the Housing Grants, Construction and Regeneration Act 1996 either party to a construction contract can refer an extension of time dispute to adjudication at any time, and the adjudicator can open up, revise and review the…Reviewed 13 oct 2026
- Delay notice templates for JCT 2024 and NEC4 (England and Wales)A delay notice puts the cause, the date and the claim on the record before the other side can say it never heard of them. Under JCT Design and Build 2024 the Contractor notifies delay to progress "forthwith" once it is…Reviewed 13 oct 2026
- Extension of time in AlbertaAlberta is the best Canadian forum for a late-crystallising private delay claim and the worst for a public one. Private-sector adjudication runs post-completion and alongside litigation, on provincial Crown public works delay is…Reviewed 9 ago 2026
- Alberta delay claim clocksAlberta runs six clocks on a delay claim, contractual notice, adjudication, lien, holdback, limitation and prosecution of the action itself. Which of them exist at all depends on which Act you are on: on a provincial Crown public…Reviewed 9 ago 2026
- Prompt payment and adjudication in AlbertaAlberta runs two payment regimes. In the private sector it is the most claim-friendly adjudication forum in Canada a consent catch-all, referral up to 30 days after final payment, concurrent with litigation, and no cap. On…Reviewed 9 ago 2026
- Notice and time bars in AlbertaOn an Alberta provincial public work the notice that matters is statutory: Public Works Act s 14(3) requires registered mail within 45 days, strictly enforced. On private work CCDC 2 – 2020 GC 6.5.4 gives 10 Working Days from…Reviewed 10 sept 2026
- Limitation periods and claim accrual in AlbertaAlberta gives a delay claimant two years from knowing the injury occurred, was attributable to the defendant and warrants a proceeding, and ten years from the first actionable breach. Under s 7(2) a limitation period may be…Reviewed 9 ago 2026
- Liens, the lien fund and trust in AlbertaAn Alberta lien secures delay damages only where they relate directly to the liened work lost productivity on that project, not inability to work elsewhere. And the lien fund is not the trust: PPCLA s 22 bites only on payments…Reviewed 9 ago 2026
- Arbitration and forum for Alberta delay claimsThe real Alberta risk in a delay claim is the forum, not the doctrine. An arbitral finding on delay causation is effectively unappealable, the courts have no construction list, expert evidence is capped at one expert per subject…Reviewed 10 sept 2026
- Oil, gas and industrial delay claims in AlbertaAlberta's oil, gas and industrial construction is the highest-value, least-precedented delay environment in Canada. There is no standard EPC or EPCM form, no turnaround authority, no winter authority and no regulatory-delay…Reviewed 9 ago 2026
- Extension of time in British ColumbiaBritish Columbia is the birthplace of Canadian delay doctrine and the jurisdiction that has done least with it since. It supplies the national anchors on prevention, notice, acceleration and total cost, then goes quiet for twenty…Reviewed 8 sept 2026
- British Columbia Delay Claim ClocksEvery deadline that can end a British Columbia delay claim, grouped by the clock it belongs to and by its character in law, contractual condition precedent, statutory precondition, limitation period, or condition of a security…Reviewed 8 sept 2026
- Notice and Time Bars in British ColumbiaBritish Columbia enforces construction notice provisions purposively rather than mechanically. A BC court asks what the clause was for and whether the owner was actually deprived of it, in substance and in good time. That is…Reviewed 10 sept 2026
- Prevention and Time at Large in British ColumbiaBritish Columbia supplies both Canadian prevention anchors and the strongest candidate for a Canadian judgment actually finding time at large, Hawl-Mac (1985). That proposition contradicts most national commentary, rests on a…Reviewed 8 sept 2026
- Concurrent Delay and Apportionment in British ColumbiaBritish Columbia apportions concurrent delay as a damages exercise rather than an entitlement exercise. There is no Malmaison, no dominant cause and no first-in-time in BC. The province has both precise day-by-day apportionment…Reviewed 8 sept 2026
- Prolongation, Acceleration and Quantum in British ColumbiaBritish Columbia's delay-quantum philosophy is actual cost, proved. Head-office overhead runs on Shore & Horwitz rather than a formula, total cost is available as a last resort through the W A Stephenson gateway, and the province…Reviewed 8 sept 2026
- Limitation Periods and Claim Accrual in British ColumbiaIn British Columbia the deadline that kills a delay claim is almost always a Builders Lien Act deadline, not a Limitation Act one. The Act gives two years from discovery, the lien, holdback and trust clocks expire far sooner, and…Reviewed 8 sept 2026
- Liens, Holdback and the Statutory Trust in British ColumbiaBritish Columbia's Builders Lien Act creates two trusts, a 10% holdback, a 45-day lien filing period and a separate lien on the holdback fund. Together they, not the Limitation Act, set the deadlines that decide whether a delayed…Reviewed 8 sept 2026
- Prompt Payment and Adjudication, British ColumbiaBritish Columbia has no prompt payment and no construction adjudication. The Construction Prompt Payment Act received Royal Assent on 27 November 2025 and is not in force as at 8 September 2026, no adjudication authority has been…Reviewed 8 sept 2026
- Arbitration, Experts and Forum in British ColumbiaBritish Columbia decides most large delay disputes in confidential arbitration, and the Arbitration Act permits appeal only on a question of law. Because contract interpretation is mixed fact and law, an arbitrator's reading of…Reviewed 8 sept 2026
- Public Works and Infrastructure, British ColumbiaBritish Columbia's public construction owners allocate delay differently from one another and from CCDC 2. The MOTI Major Works General Conditions give time but not money for abnormal weather, the Site C contract excludes flood…Reviewed 8 sept 2026
- Extension of time in United States construction claimsIn US construction, there is no single EOT rule: federal contracting, private AIA-form work, and each state's law on no-damage-for-delay clauses can give materially different answers on the same facts, and critical-path proof is…Reviewed 1 sept 2026
- Extension of time: the claim clocks in US constructionA 'claim clock' is a contractual or statutory deadline that can extinguish or cap a US construction delay claim if missed. US practice layers three kinds: AIA's 21-day Claim window, FAR's stacked notice/cost-cutoff/proposal…Reviewed 1 sept 2026
- The Claim-Within-a-Claim Trap in US Notice MachineryNotice-and-time-bar mechanics in US construction turn on structural questions a deadline calendar can't answer: whether a bare time request is itself a Claim, why owner LD assessment skips the Claims machinery entirely, and why a…Reviewed 1 sept 2026
- There Is No Prevention Principle in US Construction LawUS law has no doctrine called "the prevention principle" and no concept of "time at large." A practitioner trained in English law looking for either will find neither. The same commercial result, that an owner who caused delay…Reviewed 1 sept 2026
- Concurrent Delay: Why the Contractor's Burden Is the TrapIn US federal practice, concurrent delay is a rule of proof, not substantive law: where both parties contribute to a delay, neither recovers unless the evidence permits clear apportionment, and it is the contractor, not the…Reviewed 6 oct 2026
- No-Damage-for-Delay Clauses: Enforceable in Texas, Void in OhioA no-damage-for-delay (NDFD) clause limits a contractor's delay remedy to a time extension only. US enforceability is not uniform: it turns on state law, judicially created exceptions, and, in a minority of states, statutory…Reviewed 1 sept 2026
- Constructive Acceleration: A Claim Parasitic on the EOT ClaimConstructive acceleration is a US claim theory arising when an owner refuses or fails to act on a valid extension-of-time request and instead insists on the original completion date, forcing the contractor to expend extra…Reviewed 1 sept 2026
- Extension of time in AustraliaAustralian delay and extension-of-time law runs on one common law and eight statutory regimes. Doctrine. Prevention, penalties, concurrency, global claims, delay analysis. Does not change at the state line. What changes is the…Reviewed 26 sept 2026
- Prevention principle and time at large in AustraliaIn Australia the prevention principle has been largely displaced by the Superintendent's unilateral power to extend time, which must be exercised honestly and fairly. A principal that will not use it for delay it caused loses its…Reviewed 13 oct 2026
- Concurrent delay in AustraliaAustralia has no judicial default on concurrent delay. The answer is set entirely by contract. AS 4000-1997 cl 34.4 apportions overlapping delay. AS 2124-1992 cl 35.5 denies an extension of time for the concurrent period…Reviewed 1 sept 2026
- Notice and time bars in AustraliaAustralian EOT time bars are enforceable conditions precedent everywhere, subject to the Superintendent's duty to act honestly, waiver, and the weak Gaymark argument. Since 15 April 2026, Victoria joins Western Australia as the…Reviewed 26 sept 2026
- Liquidated damages and penalties in AustraliaAustralia runs its own penalties doctrine, wider than England's at the gateway and narrower nowhere. Andrews v ANZ [2012] HCA 30 lets a stipulation be struck even without breach. Paciocco [2016] HCA 28 sets an "out of all…Reviewed 1 sept 2026
- Prolongation and delay costs in AustraliaAustralian law lets a delayed contractor recover extended site overhead, actual off-site overhead, plant standby, escalation and lost profit or opportunity, but by proof of actual cost, not by formula. No Australian decision has…Reviewed 1 sept 2026
- Global claims and total cost in AustraliaA global (or total cost) claim lumps prolongation losses together instead of linking each loss to a specific compensable event. Australian law permits this only where apportionment is proved impracticable, and unlike England or…Reviewed 13 oct 2026
- Acceleration in Australian Construction ClaimsConstructive acceleration is not a recognised doctrine in Australian law. Contractors instead recover acceleration costs as damages for breach of the Superintendent's duty to administer the extension-of-time machinery honestly…Reviewed 1 sept 2026
- Delay analysis methods in AustraliaAustralian courts choose delay-analysis methodology from the facts, not from a protocol. White Constructions [2019] NSWSC 1166 held the SCL Delay and Disruption Protocol is not a rule of law and rejected both parties' experts.…Reviewed 1 sept 2026
- Records and expert evidence in AustraliaAustralian delay claims are won or lost on contemporaneous records and on an expert who can expose their reasoning under Makita. Concurrent evidence. "hot-tubbing". Is an Australian invention now used worldwide, but no located…Reviewed 1 sept 2026
- Limitation and Long-Stops: AustraliaAustralian breach-of-contract claims carry a six-year limitation period, except the Northern Territory's three years. Five states and territories also run a building-action long-stop of about ten years. Absent in Queensland and…Reviewed 1 sept 2026
- Security of Payment and Adjudication: AustraliaEvery Australian jurisdiction now lets an adjudicator value a delay or prolongation claim, on a payment-claim timetable measured in business days. No statute names extension of time, so it arrives through valuation,…Reviewed 26 sept 2026
Variations20
- Modificaciones de obraUn cambio en el alcance contractual, ordenado bajo la propia potestad de modificación del contrato y valorado por la maquinaria de precios del contrato. Si una partida es una modificación es cuestión de interpretación del…Reviewed 13 oct 2026
- What counts as a variationA variation is a change to the design, quality or quantity of the works as defined by the contract documents, instructed under the contract's change mechanism. Whether an item qualifies is a question of construing the contract,…Reviewed 13 oct 2026
- Written instruction and waiverA variation is compensable only if instructed, in writing, by the named person, before the cut-off. Whether an unwritten instruction can still be paid for depends entirely on the regime: England enforces the formality, Australia…Reviewed 13 oct 2026
- Constructive and deemed variationsConstructive change is a United States doctrine: work beyond the contract requirements, ordered expressly or impliedly by the government. No doctrine of that name exists elsewhere: England, Canada, Australia and FIDIC use deemed…Reviewed 13 oct 2026
- Valuation and the pricing ladderAlmost every construction contract values a variation by climbing a ladder (contract rates, then adjusted rates, then a fair valuation, then daywork) and a party may not skip a rung because it prefers the answer further up. NEC4…Reviewed 26 sept 2026
- Change order releases and reservation of rightsElement 5 of the variation claim, and the one with no extension-of-time analogue: the impact claim you meant to bring at the end has already been released by the change orders you signed along the way. Impact claims die in signed…Reviewed 6 oct 2026
- Órdenes de cambio en Estados UnidosLa práctica estadounidense de órdenes de cambio descansa sobre dos doctrinas que ninguna otra jurisdicción de las que cubre este sitio tiene con nombre propio: el cambio constructivo (constructive change) y el cambio fundamental…Reviewed 22 sept 2026
- Instrucción escrita y renuncia en Estados UnidosQue un contratista cobre un cambio ejecutado sin orden de cambio firmada depende, en primer lugar, de quién sea el comitente. En obra privada, la exigencia de orden de cambio escrita es un término contractual al que el comitente…Reviewed 22 sept 2026
- El cambio constructivo en Estados UnidosUn cambio constructivo (constructive change) es obra que excede las exigencias del contrato y que el comitente ordenó, expresa o implícitamente, sin emitir una orden de cambio formal. En la obra federal, FAR 52.243-4(b) trata esa…Reviewed 22 sept 2026
- Cambio fundamental en Estados UnidosUn cambio fundamental (cardinal change) es una alteración tan drástica que, en la práctica, obliga al contratista a ejecutar prestaciones sustancialmente distintas de las pactadas originalmente. Queda fuera de la cláusula de…Reviewed 22 sept 2026
- Renuncias en órdenes de cambio y reserva de derechos en Estados UnidosUn finiquito en una orden de cambio es la redacción de una orden de cambio firmada o de una modificación bilateral por la que el contratista acepta el ajuste indicado como compensación íntegra y renuncia a ulteriores…Reviewed 6 oct 2026
- Órdenes de cambio en CaliforniaLa práctica californiana de órdenes de cambio funciona sobre el marco general estadounidense (la división entre obra privada y obra pública sobre quién puede vincular al comitente, y las doctrinas de estilo federal trasladadas a…Reviewed 22 sept 2026
- California SB 440: la ley de pago de órdenes de cambioPara los contratos celebrados a partir del 1 de enero de 2026, los §§ 8850–8851 del Cal. Civ. Code (añadidos por la SB 440) dan a contratistas y subcontratistas de la mayor parte de la obra privada californiana un procedimiento…Reviewed 22 sept 2026
- Reclamaciones por modificaciones en Australia: AS 4000, AS 2124 y los cambios de 2026Una reclamación por modificación en Australia se gana o se pierde en tres extremos: quién ordenó la obra, por escrito, y antes de qué fecha; si la obra estaba realmente fuera del contrato; y, desde el 15 de abril de 2026, dónde…Reviewed 26 sept 2026
- Modificaciones verbales en Australia: por qué Rock Advertising nunca cruzóEn Australia, una cláusula que exige que las modificaciones consten por escrito no impide que el Principal y el Contractor acuerden una modificación verbalmente o por actos concluyentes, ni derrota una estoppel. Liebe v Molloy…Reviewed 26 sept 2026
- Modificaciones presuntas y condiciones latentes según AS 4000 en AustraliaAustralia no tiene una doctrina llamada constructive change. La obra que nadie ordenó formalmente llega a la cuenta de modificaciones por otras cuatro vías: una disposición contractual expresa de presunción (bajo AS 4000:2025,…Reviewed 26 sept 2026
- Valorar una modificación según AS 4000: cómo se valora una modificación en AustraliaBajo AS 4000 (y, según los resúmenes, AS 4902) una modificación ordenada se valora descendiendo por un orden fijo: acuerdo previo, después precios o tarifas del Contrato, después tarifas de un listado valorado aunque no sea…Reviewed 26 sept 2026
- Plantillas de aviso de modificación para AS 4000 y AS 2124Un aviso de modificación deja constancia de un solo hecho: que una orden cambió la obra, y lo hace ante la persona correcta, por escrito y a tiempo. Bajo AS 4000 (1997 y 2025) la propia modificación debe ser ordenada por escrito…Reviewed 6 oct 2026
- Modificaciones en Victoria: seguridad de pago después del 15 de abril de 2026Victoria era la única jurisdicción australiana en la que una modificación disputada en la mayoría de los contratos grandes no podía someterse a adjudication. El 15 de abril de 2026 derogó el régimen de la "claimable variation" y…Reviewed 26 sept 2026
- Reclamaciones por modificaciones en la adjudication de Victoria: arts. 10A–10B derogados, art. 13A vigenteDesde el 15 de abril de 2026 una modificación disputada puede incluirse en un payment claim de Victoria y llevarse a adjudication como cualquier otro importe: el régimen de la "claimable variation" y de los "excluded amounts" de…Reviewed 26 sept 2026
The notice brief
One email a month on claims, notices and the cases that decided them.
The notice briefIssue 01 · sample
This month: three notice clocks and their judgments.
- 01Notice and time bars in OntarioIn Ontario a contractual notice of delay is a condition precedent: miss it and the claim is…
- 02Notice and time bars in AustraliaAustralian EOT time bars are enforceable conditions precedent everywhere, subject to the…
- 03Modelos de aviso de retraso para AS 4000, FIDIC 2017 y CCDC 2Un aviso de retraso deja constancia a tiempo de un solo hecho: que algo ha retrasado, o…
Each issue links to the full articles in the Storia Library.