Claims & Dispute Resolution

Avoid the claim. Or build it in days.

Storia builds the project narrative while the job runs. Settle on facts, or turn the same record into a claim draft in days, every paragraph citing its page.

  • Every paragraph cites its page
  • Built while the project runs
  • Editable by your expert
Narrativa del reclamo · CRC-01Proyecto de muestra
StoriaNarrativa del reclamo · borrador

4 · Cadena de eventos

  1. 4.1CR-014 was submitted on 18 Jul 2026 and asked to re-plan the Level 3 labs.Ex. A, p. 1
  2. 4.2The request was carried through meetings 02 to 06 without a decision.Ex. B, item 4.3
  3. 4.3The contractor's review of DWG-M-204 was held while CR-014 stayed open.Ex. C, register
  4. 4.4The lab wing IFC moved 73 days on the critical path.Ex. D, update 22 Apr
ABCD

18 anexos · cada párrafo citado a su página

Cómo se integra

From dated events to a cited claim.

Events on the record gather into a chain of evidence. Storia assembles the chain into the claim narrative, every paragraph citing its page.

Claim narrative

A structured first draft, not a filing. Cover, contents, chain of events and exhibits, ready for your expert and counsel.

  1. 01

    Chain of events, in date order

  2. 02

    Critical path and cost impact

  3. 03

    Exhibits labelled and placed

Ver un informe de muestra completo →
One record, two outcomes

Two outcomes, from the same evidence.

The evidence gathered to resolve a dispute is the evidence that supports the claim if resolution fails. Nothing is found twice.

  • Resolve: a dated timeline anyone can check
  • Claim: the same timeline, drafted and exhibited
  • Both refine as the record grows
CR-014 · lab wingOne record
  1. A1
    Change orderResolve: CR-014 traced across five meetingsPut in front of the owner at meeting 07
    Closed
  2. A2
    MinutesResolve: decision date agreed from the minutesNo escalation
  3. B1
    CorrespondenceClaim: evidence assembled from the same recordMail, minutes, drawings, schedule
  4. B2
    ScheduleClaim: critical path impact countedIFC, lab wing
    +73 d
The shift

Collation is the part that costs you months.

7daysTo a claim draftwhere assembly usually takes six to twelve weeks.Sample draft · CRC-01
18exhibitsCited and labelledacross a 42 page draft, with no paragraph left without a source.Sample draft · CRC-01
01 / 02 · Before a claim

Close disputes on facts.

Trace cause and effect across RFIs, change orders and the schedule before anything escalates.

  • Issues resolved in the open
  • Hunting for documents cut to near zero
  • Weeks of fact finding become minutes
Assembling the factsBefore a claim
  1. Without
    Weeks of retrieval across four toolsOpinions and part of the document set
  2. With
    Minutes, with every fact datedA linked timeline anyone can check
02 / 02 · Building the claim

When resolution is not possible.

The same record becomes a claim narrative with the evidence and the timeline attached.

  • Chain of events and impact built from the record
  • Every paragraph cites its page
  • Keeps refining as the record grows
Narrative draft · CRC-01Working draft
  1. Critical path delayIFC, lab wing
    73 d
  2. Timeline eventsFrom 18 Jul to 02 Nov
    14
  3. Linked sourcesAconex, SharePoint, Outlook, P6
    25
  4. Time to draftWhere it usually takes 6 to 12 weeks
    7 d
The deliverable

A claim narrative, drafted.

Paginated and exhibited, ready to hand to your expert. The contents build as the narrative does.

SectionPageBuilt from
Executive summaryp. 3The chain of events
Chain of eventsp. 5Minutes, mail, CR-014
Critical path analysisp. 14Primavera P6 updates
Exhibit A · CR-014, Level 3 lab layout changep. 24Aconex
Exhibit B · minutes, meetings 02 to 06p. 28SharePoint
Exhibit C · DWG-M-204, document registerp. 32Aconex
Exhibit D · schedule update 22 Aprp. 36Primavera P6
Un registro, cuatro productos

Encuéntrelo, ordénelo, repórtelo.

Los productos comparten una sola lectura del registro del proyecto. Nada se sube dos veces.

Claims & Dispute Resolution

Send us the project. We will send back the story.

Bring the documents you already have. In twenty minutes we walk you through the timeline we assembled, and tell you honestly whether you have a claim or a conversation.