Procore integration
Issue intelligence, inside Procore.
The moment an RFI, change event or PCO lands in Procore, Storia reads it, classifies it against a structured issue taxonomy and writes a primary and secondary issue back to the record. The record stays in Procore.
- Webhook on create and update
- Primary and secondary issue
- Zero retention
RFIRFIs / RFI-213
Supply duct clashes with slab penetrations at gridline C4Written back to the record
- Primary issue1.2.2Interdisciplinary conflict
- Secondary issue2.2.2Lack of access
The record stays in Procore · zero retention on Storia
The panel docks where the field already looks.
RFIs / RFI-213
RFI-213 · Supply duct clashes with slab penetrations at gridline C4
- Question
- “The Level 3 supply duct clashes with the slab penetrations at gridline C4, by about 100 mm. Please advise on routing.”
- Submitted
- 14 Oct 2026
- Responses
- 2 · from Firm B, mechanical · pending official
Three moves, and none of them leave Procore.
- 01 · Detect
Read each RFI, change event and PCO as it lands.
The webhook fires on create and on update. Storia reads that one record for coordination gaps, scope ambiguity, missing information and change risk.
Trigger · webhook - 02 · Classify
Assign a primary and a secondary issue.
The record is classified against a three level taxonomy. RFI-213 reads as interdisciplinary conflict (1.2.2), with lack of access (2.2.2) as the secondary frame.
Output · 2 issue tags - 03 · Surface
Write the classification back into Procore.
A side panel docks beside the record with the issues, their taxonomy paths, definitions and worked examples. The PM reads it without leaving the RFI.
Surface · docked panel
Procore holds the record. Storia holds nothing.
- RFI, change event, PCO
- Created or updated by the field, in the tool they already use.
- The record, unchanged
- Same fields, same workflow, same permissions.
- Classify against the taxonomy
- Three levels, primary and secondary, resolved on create and on update.
- Nothing kept
- Classification runs in memory. No project data is stored on Storia’s side.
Reads each record in · classifies in memory · writes one note back
Same Procore. Different visibility.
| Procore alone | Procore with Storia | |
|---|---|---|
| Issue visibility | Each RFI, change event and PCO opens in its own record. The PM reads the title and decides what kind of issue it is. | RFI-213 arrives tagged: primary, interdisciplinary conflict (1.2.2); secondary, lack of access (2.2.2). |
| Time to classify | Manual triage. Categories are filled in after the fact, or skipped. | Automatic, on create and on update, before the response is written. |
| Workflow change | None. | None. Storia writes back into the Procore record, and the field never leaves Procore. |
| Data retention | Project data stays in Procore. | Project data stays in Procore. Storia keeps nothing on its side. |
Installed per company. Scoped per project.
- Data flow
- Procore keeps the record. Storia reads each record in and writes a note back.
- Records
- RFI, change event and PCO, on create and on update. More record types on request.
- Trigger
- Webhook, in real time, the moment a record lands or changes.
- Retention
- Zero on Storia. Classification runs in memory.
- Setup
- Under 30 minutes. Install from the App Marketplace, scope the project.
See it on your own Procore project.
Thirty minutes, your records. The field gets no new dashboard: the issues arrive in the RFI they already open.