The Storia Library
All articles
92 articles
Sort
Extension of time72
- Prolongation de délaiUn instrument contractuel qui déplace la date d'achèvement parce que les travaux ont été retardés par un événement qui ne relevait pas du risque de l'entrepreneur, le libérant de sa responsabilité pour les dommages d'achèvement…Reviewed 13 oct. 2026
- Retards concomitantsIl y a retard concomitant lorsqu'un événement relevant du risque du maître de l'ouvrage et un événement relevant du risque de l'entrepreneur causent tous deux la même période de dépassement critique. Ce point n'est réglé nulle…Reviewed 13 oct. 2026
- Notice and time barsA notice clause is a time bar where the contract makes the extension of time conditional on serving notice within a stated period. Under FIDIC 2017 Sub-Clause 20.2.1 and NEC4 clause 61.3 failure forfeits entitlement outright.…Reviewed 13 oct. 2026
- Méthodes d'analyse de retard comparées : laquelle vos documents peuvent étayerUne méthode d'analyse de retard est la technique employée pour prouver qu'un événement ouvrant droit a retardé l'achèvement. Le SCL Delay and Disruption Protocol, 2nd Edition (February 2017) présente sous forme de tableau six…Reviewed 13 oct. 2026
- Prolongation and delay costsAn extension of time and compensation are separate gateways: winning the time does not win the money. Prolongation cost is assessed for the period when the effect of the employer risk event was actually felt, not the overrun at…Reviewed 7 août 2026
- Records and evidence for an EOT claimThe records a project keeps decide which delay analysis methods it can run, and that set closes long before anyone knows there is a dispute. The SCL Delay and Disruption Protocol, 2nd Edition (February 2017) names six record…Reviewed 13 oct. 2026
- Modèles d'avis de retard pour l'AS 4000, le FIDIC 2017 et le CCDC 2Un avis de retard consigne un seul fait, en temps utile : qu'un événement a retardé, ou retardera, les travaux, et que vous réclamez le délai. L'AS 4000 exige un avis de retard sans délai au titre de la cl 34.2, puis une demande…Reviewed 13 oct. 2026
- Comment rédiger une demande de prolongation de délaiUne demande de prolongation de délai aboutit lorsqu'elle prouve, selon les termes mêmes du contrat et dans ses délais, quatre choses : une cause de retard ouvrant droit qui ne relevait pas du risque de l'entrepreneur, le fait…Reviewed 13 oct. 2026
- Liste de contrôle avant une demande de prolongationUne demande de prolongation de délai est prête lorsqu'une personne étrangère au projet pourrait vérifier chacune de ses affirmations au regard d'une pièce datée. Cela suppose que sept éléments soient en place : le fondement…Reviewed 13 oct. 2026
- Prolongation de délai au QuébecAu Québec, il n'existe ni date d'achèvement légale, ni mécanisme légal de prolongation de délai, ni « time at large ». Le délai relève entièrement du contrat, et lorsqu'un tribunal québécois libère un entrepreneur des…Reviewed 8 août 2026
- Quebec vs common-law Canada: what a common lawyer gets wrong about delayQuebec is a civil-law jurisdiction inside a common-law federation, and the delay doctrines a Canadian practitioner relies on mostly do not exist there. There is no time at large, no concurrent-delay doctrine, no imprévision and…Reviewed 8 août 2026
- The Civil Code framework for delay in QuebecThe Code civil du Québec contains no provision on time for completion, delay or extension of time. Arts 2098–2129 were read individually. Time appears once, at art 2102, as a pre-contractual disclosure duty on the contractor.…Reviewed 8 août 2026
- Notice and time bars in QuebecQuebec enforces contractual claim time bars strictly: a missed notice or claim deadline normally forfeits the entitlement, whatever the merits. Only three arguments defeat one: waiver, breach of the owner's obligation de…Reviewed 8 août 2026
- Concurrent delay in QuebecQuebec has no doctrine of concurrent delay. No Quebec authority, doctrine or professional commentary on « délais concomitants » as a distinct doctrine was located. Where two causes operate on the same overrun, a Quebec court…Reviewed 8 août 2026
- Delay penalties and the clause pénale in QuebecQuebec has no penalty versus liquidated-damages distinction. A clause pénale is valid under art 1622 C.c.Q. and enforceable without proof of loss under art 1623 para 1. The remedy is reduction, not nullity: art 1623 para 2 allows…Reviewed 8 août 2026
- Prolongation de délai au CanadaLe droit canadien du retard et de la prolongation de délai relève presque entièrement de la common law et du contrat. Aucune province ni aucun territoire n'a de loi traitant du retard de construction comme tel. Sur la procédure,…Reviewed 10 sept. 2026
- Delay regimes by Canadian province: what changes at the borderNo Canadian province or territory has a statute addressing construction delay as such, so delay law is common law and contract everywhere. What changes at the border is the machinery around the claim: whether a limitation period…Reviewed 8 sept. 2026
- Notice and time bars in CanadaCanadian courts enforce construction notice clauses as conditions precedent, and the owner need not prove prejudice. Under CCDC 2 – 2020 GC 6.5.4 the contractor has 10 Working Days from the commencement of the delay not from its…Reviewed 10 sept. 2026
- Concurrent delay in CanadaCanadian courts treat delays as concurrent where delays to co-critical and co-controlling activities overlap, and they apportion time and money alike. On remedy that is closer to the United States than to England, which awards a…Reviewed 13 oct. 2026
- Liquidated damages and the penalty rule in CanadaCanada has not adopted Cavendish Square v Makdessi. A delay liquidated damages clause is enforceable only if the rate is a genuine pre-estimate of loss, and is separately vulnerable to an unconscionability challenge. Where the…Reviewed 8 sept. 2026
- Prevention principle and time at large in CanadaIn Canada an owner that has prevented the contractor from completing on time cannot insist on liquidated damages, and where no extension is granted the completion date can fall away. Perini Pacific is the anchor, but the domestic…Reviewed 10 sept. 2026
- Prolongation and delay costs in CanadaCanadian law compensates delay through two routes: the contract's own reimbursement clause and damages for breach. Extended site overhead, unabsorbed head-office overhead, equipment standby and acceleration are all recoverable in…Reviewed 8 sept. 2026
- Extension of time in OntarioOntario is the only Canadian jurisdiction where an extension of time is adjudicable, and the only one where a commercial contract may lawfully shorten or exclude a limitation period. Both turn on the contract date. A delay claim…Reviewed 10 sept. 2026
- Ontario delay claim clocksOntario runs five independent clocks on a delay claim: contractual notice, adjudication, lien, holdback and limitation. Each has a different trigger, a different character in law and a different consequence for being missed, and…Reviewed 10 sept. 2026
- Notice and time bars in OntarioIn Ontario a contractual notice of delay is a condition precedent: miss it and the claim is gone, and the owner need not prove prejudice. Content counts as much as timing. An insufficient claim submission is treated as no notice…Reviewed 10 sept. 2026
- Prompt payment and adjudication in OntarioSince 1 January 2026 Ontario is the only Canadian jurisdiction where an extension of time can be adjudicated. And only as an ancillary head, only where reasonably necessary to a money determination, not on P3 projects, and not on…Reviewed 10 sept. 2026
- Limitation periods and claim accrual in OntarioOntario gives a delay claim two years from discovery under the Limitations Act, 2002, with a fifteen-year long-stop. Uniquely in Canada, section 22 lets commercial parties to a business agreement extend, shorten, suspend or…Reviewed 8 août 2026
- Liens, holdback and security for a delay claim in OntarioAn Ontario construction lien secures a delay claim only in part. The line is price versus damages: extended-duration equipment and extra labour caused by owner default are lienable. Overhead, lost profit on other jobs and general…Reviewed 10 sept. 2026
- Extension of time in England and WalesEnglish law gives a contractor more time through the contract's own machinery: a Relevant Event under JCT, a compensation event under NEC4. The prevention principle is a default rule the parties can displace, concurrent delay is…Reviewed 13 oct. 2026
- Concurrent delay in England and WalesIn England and Wales the working default on concurrent delay is time yes, money no: where a Relevant Event and a Contractor-risk event are both effective causes of the same critical delay, the Contractor gets a full extension of…Reviewed 13 oct. 2026
- Notice and time bars in England and WalesIn English law a notice clause bars a claim only if, on its true construction, it makes the relief conditional on the notice. Disclosure and Barring Service v Tata Consultancy Services Ltd [2025] EWCA Civ 380 sets out five…Reviewed 13 oct. 2026
- Prevention principle and time at large in England and WalesIn England and Wales the prevention principle is a default rule of risk allocation that clear words displace, not an overriding rule of law. An employer act that in fact delays completion sets time at large only where the…Reviewed 13 oct. 2026
- Adjudicating extensions of time in England and WalesUnder the Housing Grants, Construction and Regeneration Act 1996 either party to a construction contract can refer an extension of time dispute to adjudication at any time, and the adjudicator can open up, revise and review the…Reviewed 13 oct. 2026
- Delay notice templates for JCT 2024 and NEC4 (England and Wales)A delay notice puts the cause, the date and the claim on the record before the other side can say it never heard of them. Under JCT Design and Build 2024 the Contractor notifies delay to progress "forthwith" once it is…Reviewed 13 oct. 2026
- Extension of time in AlbertaAlberta is the best Canadian forum for a late-crystallising private delay claim and the worst for a public one. Private-sector adjudication runs post-completion and alongside litigation, on provincial Crown public works delay is…Reviewed 9 août 2026
- Alberta delay claim clocksAlberta runs six clocks on a delay claim, contractual notice, adjudication, lien, holdback, limitation and prosecution of the action itself. Which of them exist at all depends on which Act you are on: on a provincial Crown public…Reviewed 9 août 2026
- Prompt payment and adjudication in AlbertaAlberta runs two payment regimes. In the private sector it is the most claim-friendly adjudication forum in Canada a consent catch-all, referral up to 30 days after final payment, concurrent with litigation, and no cap. On…Reviewed 9 août 2026
- Notice and time bars in AlbertaOn an Alberta provincial public work the notice that matters is statutory: Public Works Act s 14(3) requires registered mail within 45 days, strictly enforced. On private work CCDC 2 – 2020 GC 6.5.4 gives 10 Working Days from…Reviewed 10 sept. 2026
- Limitation periods and claim accrual in AlbertaAlberta gives a delay claimant two years from knowing the injury occurred, was attributable to the defendant and warrants a proceeding, and ten years from the first actionable breach. Under s 7(2) a limitation period may be…Reviewed 9 août 2026
- Liens, the lien fund and trust in AlbertaAn Alberta lien secures delay damages only where they relate directly to the liened work lost productivity on that project, not inability to work elsewhere. And the lien fund is not the trust: PPCLA s 22 bites only on payments…Reviewed 9 août 2026
- Arbitration and forum for Alberta delay claimsThe real Alberta risk in a delay claim is the forum, not the doctrine. An arbitral finding on delay causation is effectively unappealable, the courts have no construction list, expert evidence is capped at one expert per subject…Reviewed 10 sept. 2026
- Oil, gas and industrial delay claims in AlbertaAlberta's oil, gas and industrial construction is the highest-value, least-precedented delay environment in Canada. There is no standard EPC or EPCM form, no turnaround authority, no winter authority and no regulatory-delay…Reviewed 9 août 2026
- Extension of time in British ColumbiaBritish Columbia is the birthplace of Canadian delay doctrine and the jurisdiction that has done least with it since. It supplies the national anchors on prevention, notice, acceleration and total cost, then goes quiet for twenty…Reviewed 8 sept. 2026
- British Columbia Delay Claim ClocksEvery deadline that can end a British Columbia delay claim, grouped by the clock it belongs to and by its character in law, contractual condition precedent, statutory precondition, limitation period, or condition of a security…Reviewed 8 sept. 2026
- Notice and Time Bars in British ColumbiaBritish Columbia enforces construction notice provisions purposively rather than mechanically. A BC court asks what the clause was for and whether the owner was actually deprived of it, in substance and in good time. That is…Reviewed 10 sept. 2026
- Prevention and Time at Large in British ColumbiaBritish Columbia supplies both Canadian prevention anchors and the strongest candidate for a Canadian judgment actually finding time at large, Hawl-Mac (1985). That proposition contradicts most national commentary, rests on a…Reviewed 8 sept. 2026
- Concurrent Delay and Apportionment in British ColumbiaBritish Columbia apportions concurrent delay as a damages exercise rather than an entitlement exercise. There is no Malmaison, no dominant cause and no first-in-time in BC. The province has both precise day-by-day apportionment…Reviewed 8 sept. 2026
- Prolongation, Acceleration and Quantum in British ColumbiaBritish Columbia's delay-quantum philosophy is actual cost, proved. Head-office overhead runs on Shore & Horwitz rather than a formula, total cost is available as a last resort through the W A Stephenson gateway, and the province…Reviewed 8 sept. 2026
- Limitation Periods and Claim Accrual in British ColumbiaIn British Columbia the deadline that kills a delay claim is almost always a Builders Lien Act deadline, not a Limitation Act one. The Act gives two years from discovery, the lien, holdback and trust clocks expire far sooner, and…Reviewed 8 sept. 2026
- Liens, Holdback and the Statutory Trust in British ColumbiaBritish Columbia's Builders Lien Act creates two trusts, a 10% holdback, a 45-day lien filing period and a separate lien on the holdback fund. Together they, not the Limitation Act, set the deadlines that decide whether a delayed…Reviewed 8 sept. 2026
- Prompt Payment and Adjudication, British ColumbiaBritish Columbia has no prompt payment and no construction adjudication. The Construction Prompt Payment Act received Royal Assent on 27 November 2025 and is not in force as at 8 September 2026, no adjudication authority has been…Reviewed 8 sept. 2026
- Arbitration, Experts and Forum in British ColumbiaBritish Columbia decides most large delay disputes in confidential arbitration, and the Arbitration Act permits appeal only on a question of law. Because contract interpretation is mixed fact and law, an arbitrator's reading of…Reviewed 8 sept. 2026
- Public Works and Infrastructure, British ColumbiaBritish Columbia's public construction owners allocate delay differently from one another and from CCDC 2. The MOTI Major Works General Conditions give time but not money for abnormal weather, the Site C contract excludes flood…Reviewed 8 sept. 2026
- Extension of time in United States construction claimsIn US construction, there is no single EOT rule: federal contracting, private AIA-form work, and each state's law on no-damage-for-delay clauses can give materially different answers on the same facts, and critical-path proof is…Reviewed 1 sept. 2026
- Extension of time: the claim clocks in US constructionA 'claim clock' is a contractual or statutory deadline that can extinguish or cap a US construction delay claim if missed. US practice layers three kinds: AIA's 21-day Claim window, FAR's stacked notice/cost-cutoff/proposal…Reviewed 1 sept. 2026
- The Claim-Within-a-Claim Trap in US Notice MachineryNotice-and-time-bar mechanics in US construction turn on structural questions a deadline calendar can't answer: whether a bare time request is itself a Claim, why owner LD assessment skips the Claims machinery entirely, and why a…Reviewed 1 sept. 2026
- There Is No Prevention Principle in US Construction LawUS law has no doctrine called "the prevention principle" and no concept of "time at large." A practitioner trained in English law looking for either will find neither. The same commercial result, that an owner who caused delay…Reviewed 1 sept. 2026
- Concurrent Delay: Why the Contractor's Burden Is the TrapIn US federal practice, concurrent delay is a rule of proof, not substantive law: where both parties contribute to a delay, neither recovers unless the evidence permits clear apportionment, and it is the contractor, not the…Reviewed 6 oct. 2026
- No-Damage-for-Delay Clauses: Enforceable in Texas, Void in OhioA no-damage-for-delay (NDFD) clause limits a contractor's delay remedy to a time extension only. US enforceability is not uniform: it turns on state law, judicially created exceptions, and, in a minority of states, statutory…Reviewed 1 sept. 2026
- Constructive Acceleration: A Claim Parasitic on the EOT ClaimConstructive acceleration is a US claim theory arising when an owner refuses or fails to act on a valid extension-of-time request and instead insists on the original completion date, forcing the contractor to expend extra…Reviewed 1 sept. 2026
- Extension of time in AustraliaAustralian delay and extension-of-time law runs on one common law and eight statutory regimes. Doctrine. Prevention, penalties, concurrency, global claims, delay analysis. Does not change at the state line. What changes is the…Reviewed 26 sept. 2026
- Prevention principle and time at large in AustraliaIn Australia the prevention principle has been largely displaced by the Superintendent's unilateral power to extend time, which must be exercised honestly and fairly. A principal that will not use it for delay it caused loses its…Reviewed 13 oct. 2026
- Concurrent delay in AustraliaAustralia has no judicial default on concurrent delay. The answer is set entirely by contract. AS 4000-1997 cl 34.4 apportions overlapping delay. AS 2124-1992 cl 35.5 denies an extension of time for the concurrent period…Reviewed 1 sept. 2026
- Notice and time bars in AustraliaAustralian EOT time bars are enforceable conditions precedent everywhere, subject to the Superintendent's duty to act honestly, waiver, and the weak Gaymark argument. Since 15 April 2026, Victoria joins Western Australia as the…Reviewed 26 sept. 2026
- Liquidated damages and penalties in AustraliaAustralia runs its own penalties doctrine, wider than England's at the gateway and narrower nowhere. Andrews v ANZ [2012] HCA 30 lets a stipulation be struck even without breach. Paciocco [2016] HCA 28 sets an "out of all…Reviewed 1 sept. 2026
- Prolongation and delay costs in AustraliaAustralian law lets a delayed contractor recover extended site overhead, actual off-site overhead, plant standby, escalation and lost profit or opportunity, but by proof of actual cost, not by formula. No Australian decision has…Reviewed 1 sept. 2026
- Global claims and total cost in AustraliaA global (or total cost) claim lumps prolongation losses together instead of linking each loss to a specific compensable event. Australian law permits this only where apportionment is proved impracticable, and unlike England or…Reviewed 13 oct. 2026
- Acceleration in Australian Construction ClaimsConstructive acceleration is not a recognised doctrine in Australian law. Contractors instead recover acceleration costs as damages for breach of the Superintendent's duty to administer the extension-of-time machinery honestly…Reviewed 1 sept. 2026
- Delay analysis methods in AustraliaAustralian courts choose delay-analysis methodology from the facts, not from a protocol. White Constructions [2019] NSWSC 1166 held the SCL Delay and Disruption Protocol is not a rule of law and rejected both parties' experts.…Reviewed 1 sept. 2026
- Records and expert evidence in AustraliaAustralian delay claims are won or lost on contemporaneous records and on an expert who can expose their reasoning under Makita. Concurrent evidence. "hot-tubbing". Is an Australian invention now used worldwide, but no located…Reviewed 1 sept. 2026
- Limitation and Long-Stops: AustraliaAustralian breach-of-contract claims carry a six-year limitation period, except the Northern Territory's three years. Five states and territories also run a building-action long-stop of about ten years. Absent in Queensland and…Reviewed 1 sept. 2026
- Security of Payment and Adjudication: AustraliaEvery Australian jurisdiction now lets an adjudicator value a delay or prolongation claim, on a payment-claim timetable measured in business days. No statute names extension of time, so it arrives through valuation,…Reviewed 26 sept. 2026
Variations20
- AvenantsUne modification de l'étendue contractuelle des travaux, ordonnée en vertu du pouvoir de modification que le contrat prévoit lui-même, et évaluée par la mécanique de prix que le contrat fournit. Savoir si un poste est un avenant…Reviewed 13 oct. 2026
- What counts as a variationA variation is a change to the design, quality or quantity of the works as defined by the contract documents, instructed under the contract's change mechanism. Whether an item qualifies is a question of construing the contract,…Reviewed 13 oct. 2026
- Written instruction and waiverA variation is compensable only if instructed, in writing, by the named person, before the cut-off. Whether an unwritten instruction can still be paid for depends entirely on the regime: England enforces the formality, Australia…Reviewed 13 oct. 2026
- Constructive and deemed variationsConstructive change is a United States doctrine: work beyond the contract requirements, ordered expressly or impliedly by the government. No doctrine of that name exists elsewhere: England, Canada, Australia and FIDIC use deemed…Reviewed 13 oct. 2026
- Valuation and the pricing ladderAlmost every construction contract values a variation by climbing a ladder (contract rates, then adjusted rates, then a fair valuation, then daywork) and a party may not skip a rung because it prefers the answer further up. NEC4…Reviewed 26 sept. 2026
- Change order releases and reservation of rightsElement 5 of the variation claim, and the one with no extension-of-time analogue: the impact claim you meant to bring at the end has already been released by the change orders you signed along the way. Impact claims die in signed…Reviewed 6 oct. 2026
- Les ordres de changement aux États-UnisLa pratique américaine des ordres de changement repose sur deux doctrines qu'aucune autre juridiction couverte par ce site ne nomme ainsi, le changement constructif (constructive change) et le changement fondamental (cardinal…Reviewed 22 sept. 2026
- Instruction écrite et renonciation aux États-UnisQu'un entrepreneur soit payé pour une modification exécutée sans ordre de changement signé dépend d'abord de l'identité du maître de l'ouvrage. Sur les marchés privés, l'exigence d'un ordre de changement écrit est une stipulation…Reviewed 22 sept. 2026
- Le changement constructif aux États-UnisUn changement constructif (constructive change) est un travail excédant les exigences du contrat que le maître de l'ouvrage a ordonné, expressément ou implicitement, sans émettre d'ordre de changement formel. Dans les marchés…Reviewed 22 sept. 2026
- Le changement fondamental aux États-UnisUn changement fondamental (cardinal change) est une modification si radicale qu'elle oblige en pratique l'entrepreneur à exécuter des obligations substantiellement différentes de celles initialement négociées. Il se situe hors de…Reviewed 22 sept. 2026
- Quittances d'avenant et réserve de droits aux États-UnisUne quittance d'avenant est la formulation d'un ordre de changement signé ou d'une modification bilatérale par laquelle l'entrepreneur accepte l'ajustement stipulé comme rémunération complète et renonce à toute autre réclamation…Reviewed 6 oct. 2026
- Les avenants en CalifornieLa pratique californienne des avenants repose sur le cadre général américain (la distinction entre marchés privés et publics quant à la personne pouvant engager le maître de l'ouvrage, et les doctrines d'inspiration fédérale…Reviewed 22 sept. 2026
- SB 440 en Californie : la loi sur le paiement des ordres de changementPour les contrats conclus à compter du 1er janvier 2026, les Cal. Civ. Code §§ 8850–8851 (ajoutés par la SB 440) confèrent aux entrepreneurs et sous-traitants de la plupart des travaux privés en Californie une procédure légale de…Reviewed 22 sept. 2026
- Les réclamations pour avenant en Australie : AS 4000, AS 2124 et les changements de 2026Une réclamation pour avenant en Australie se gagne ou se perd sur trois choses : qui a ordonné les travaux, par écrit, et avant quelle date ; si les travaux étaient réellement hors du contrat ; et, depuis le 15 avril 2026, où la…Reviewed 26 sept. 2026
- Avenants verbaux en Australie : pourquoi Rock Advertising n'a jamais traverséEn Australie, une clause exigeant que les avenants soient faits par écrit n'empêche pas le Principal et le Contractor de convenir d'un avenant verbalement ou par leur comportement, et elle ne fait pas échec à un estoppel. Liebe v…Reviewed 26 sept. 2026
- Avenants réputés et conditions latentes selon l'AS 4000 en AustralieL'Australie n'a pas de doctrine appelée constructive change. Les travaux que personne n'a formellement ordonnés entrent dans le compte des avenants par quatre autres voies : une disposition de présomption expresse du contrat…Reviewed 26 sept. 2026
- Évaluer un avenant selon l'AS 4000 en AustralieSelon l'AS 4000 (et, d'après les synthèses, l'AS 4902), un avenant ordonné est évalué selon un ordre fixe : accord préalable, puis taux ou prix du Contrat, puis taux d'un bordereau chiffré, même s'il n'est pas un document…Reviewed 26 sept. 2026
- Modèles d'avis d'avenant pour l'AS 4000 et l'AS 2124Un avis d'avenant consigne un seul fait : qu'un ordre a modifié les travaux, avis donné à la bonne personne, par écrit, dans les délais. Selon l'AS 4000 (1997 et 2025), l'avenant lui-même doit être ordonné par écrit par le…Reviewed 6 oct. 2026
- Les avenants dans l'État de Victoria : sécurité des paiements après le 15 avril 2026Le Victoria était autrefois la seule juridiction australienne où un avenant contesté, sur la plupart des grands contrats, ne pouvait pas être soumis à l'adjudication. Le 15 avril 2026, il a abrogé le régime des « claimable…Reviewed 26 sept. 2026
- Réclamations d'avenant en adjudication au Victoria : art. 10A–10B abrogés, art. 13A en vigueurDepuis le 15 avril 2026, un avenant contesté peut être inclus dans un payment claim victorien et soumis à l'adjudication comme n'importe quel autre montant : le régime des « claimable variation » et des « excluded amounts » des…Reviewed 26 sept. 2026
The notice brief
One email a month on claims, notices and the cases that decided them.
The notice briefIssue 01 · sample
This month: three notice clocks and their judgments.
- 01Notice and time bars in OntarioIn Ontario a contractual notice of delay is a condition precedent: miss it and the claim is…
- 02Notice and time bars in AustraliaAustralian EOT time bars are enforceable conditions precedent everywhere, subject to the…
- 03Modèles d'avis de retard pour l'AS 4000, le FIDIC 2017 et le CCDC 2Un avis de retard consigne un seul fait, en temps utile : qu'un événement a retardé, ou…
Each issue links to the full articles in the Storia Library.