United Kingdom
Select a place1
Articles21
- Extension of timeA contractual instrument that moves the completion date because the works were delayed by an event that was not the contractor's risk, relieving liability for late-completion damages. Whether the same event also pays for the…Reviewed Oct 13, 2026
- Concurrent delayConcurrent delay is where an employer-risk event and a contractor-risk event both drive the same period of critical overrun. It is settled law nowhere. On one four-week fact pattern the answer runs from four weeks of time and no…Reviewed Oct 13, 2026
- Notice and time barsA notice clause is a time bar where the contract makes the extension of time conditional on serving notice within a stated period. Under FIDIC 2017 Sub-Clause 20.2.1 and NEC4 clause 61.3 failure forfeits entitlement outright.…Reviewed Oct 13, 2026
- Delay analysis methods compared: which one your records can supportA delay analysis method is the technique used to prove that a qualifying event delayed completion. The SCL Delay and Disruption Protocol, 2nd Edition (February 2017) tabulates six commonly used methods at paragraph 11.5: impacted…Reviewed Oct 13, 2026
- Prolongation and delay costsAn extension of time and compensation are separate gateways: winning the time does not win the money. Prolongation cost is assessed for the period when the effect of the employer risk event was actually felt, not the overrun at…Reviewed Aug 7, 2026
- Records and evidence for an EOT claimThe records a project keeps decide which delay analysis methods it can run, and that set closes long before anyone knows there is a dispute. The SCL Delay and Disruption Protocol, 2nd Edition (February 2017) names six record…Reviewed Oct 13, 2026
- Delay notice templates for AS 4000, FIDIC 2017 and CCDC 2A delay notice puts one fact on the record in time: that something has delayed, or will delay, the work, and that you claim the time. AS 4000 wants a prompt cl 34.2 delay notice, then a written cl 34.3 claim within 28 days of…Reviewed Oct 13, 2026
- How to write an EOT claim, step by stepAn extension of time claim succeeds when it proves, on the contract's own terms and inside its deadlines, four things: a qualifying cause of delay that was not the contractor's risk, that it delayed completion and not merely…Reviewed Oct 13, 2026
- EOT claim checklist: is your extension of time claim ready to submit?An extension of time claim is ready when a stranger to the project could check every assertion in it against a dated record. That means seven things are in place: the contract basis, a notice served in time to the right person,…Reviewed Oct 13, 2026
- Extension of time in England and WalesEnglish law gives a contractor more time through the contract's own machinery: a Relevant Event under JCT, a compensation event under NEC4. The prevention principle is a default rule the parties can displace, concurrent delay is…Reviewed Oct 13, 2026
- Concurrent delay in England and WalesIn England and Wales the working default on concurrent delay is time yes, money no: where a Relevant Event and a Contractor-risk event are both effective causes of the same critical delay, the Contractor gets a full extension of…Reviewed Oct 13, 2026
- Notice and time bars in England and WalesIn English law a notice clause bars a claim only if, on its true construction, it makes the relief conditional on the notice. Disclosure and Barring Service v Tata Consultancy Services Ltd [2025] EWCA Civ 380 sets out five…Reviewed Oct 13, 2026
- Prevention principle and time at large in England and WalesIn England and Wales the prevention principle is a default rule of risk allocation that clear words displace, not an overriding rule of law. An employer act that in fact delays completion sets time at large only where the…Reviewed Oct 13, 2026
- Adjudicating extensions of time in England and WalesUnder the Housing Grants, Construction and Regeneration Act 1996 either party to a construction contract can refer an extension of time dispute to adjudication at any time, and the adjudicator can open up, revise and review the…Reviewed Oct 13, 2026
- Delay notice templates for JCT 2024 and NEC4 (England and Wales)A delay notice puts the cause, the date and the claim on the record before the other side can say it never heard of them. Under JCT Design and Build 2024 the Contractor notifies delay to progress "forthwith" once it is…Reviewed Oct 13, 2026
- VariationsA change to the contract scope, instructed under the contract's own change power, valued by the contract's pricing machinery. Whether an item is a variation is a question of contract construction, not of fairness, and proving it…Reviewed Oct 13, 2026
- What counts as a variationA variation is a change to the design, quality or quantity of the works as defined by the contract documents, instructed under the contract's change mechanism. Whether an item qualifies is a question of construing the contract,…Reviewed Oct 13, 2026
- Written instruction and waiverA variation is compensable only if instructed, in writing, by the named person, before the cut-off. Whether an unwritten instruction can still be paid for depends entirely on the regime: England enforces the formality, Australia…Reviewed Oct 13, 2026
- Constructive and deemed variationsConstructive change is a United States doctrine: work beyond the contract requirements, ordered expressly or impliedly by the government. No doctrine of that name exists elsewhere: England, Canada, Australia and FIDIC use deemed…Reviewed Oct 13, 2026
- Valuation and the pricing ladderAlmost every construction contract values a variation by climbing a ladder (contract rates, then adjusted rates, then a fair valuation, then daywork) and a party may not skip a rung because it prefers the answer further up. NEC4…Reviewed Sep 26, 2026
- Change order releases and reservation of rightsElement 5 of the variation claim, and the one with no extension-of-time analogue: the impact claim you meant to bring at the end has already been released by the change orders you signed along the way. Impact claims die in signed…Reviewed Oct 6, 2026
The notice brief
One email a month on claims, notices and the cases that decided them.
The notice briefIssue 01 · sample
This month: three notice clocks and their judgments.
- 01Notice and time bars in OntarioIn Ontario a contractual notice of delay is a condition precedent: miss it and the claim is…
- 02Notice and time bars in AustraliaAustralian EOT time bars are enforceable conditions precedent everywhere, subject to the…
- 03Delay notice templates for AS 4000, FIDIC 2017 and CCDC 2A delay notice puts one fact on the record in time: that something has delayed, or will delay,…
Each issue links to the full articles in the Storia Library.