Cedarline Research Centre
Progress report · CRC-01
Confidentialité
Les témoins essentiels font fonctionner ce site. Les témoins d’analyse facultatifs nous aident à comprendre ce qui fonctionne, activés seulement si vous acceptez.
Documents Hub
Upload the files you already have. Storia reads every page, scans included, types each file and maps it, so it is searchable in a second and ready for your reports.
468 documents lus · consultables maintenant · alimentent 3 rapports
Files arrive in the formats you have. Each one is read, typed and mapped, becomes searchable, and feeds your reports.
The typed record feeds the progress report: every open decision and action, who holds it and for how many days, citing the file it came from.
Open decisions and actions, by holder
Days waiting, with the source file
What changed since last week
Each document type carries its own schema. Choose one, drop PDF, MPP or Excel, and every file is read on its own.
Storia reads the whole document, scans included, and writes the values into the record where they belong, each linked to its page.
Les produits partagent une même lecture du dossier du projet. Rien n’est téléversé deux fois.
Bring the files as they are. We type them live and hand you back a structured record of your own project.