Schedule Intelligence
Storia reads your schedule and the record around it, so every slip arrives with the document that caused it and the activities it pushed. Then it writes the delay report.
RéférentielMise à jour 22 avr.Glissement critique
3 causes remontées · dans votre rapport de retards
The schedule on one side, the record behind the slip on the other. Storia holds the moved activity against the documents that caused it, and writes the delay report.
The delay report sets every slip against the baseline, names the event behind it and counts the days each party added.
Slips since the last update, with their causes
Critical path days, by party
Linked documents for every line
Each activity links to the records that touch it, by scope, location and trade. The links are rebuilt on every update, so they survive a re-baseline.
Storia compares the schedule with its earlier versions, marks what moved and reads the linked documents to say why. One line per slip: this event, this activity, these consequences.
Float lost on the critical path: 73 d
Every revision is kept and compared, and each move is attributed to the event that drove it. Nothing is re-baselined behind the scheduler's back.
| Revision | Data date | Lab wing IFC | Driven by |
|---|---|---|---|
| Baseline | 06 Jan 2026 | 0 d | As tendered |
| Update 03 | 24 Mar 2026 | 0 d | No movement |
| Update 04 | 22 Apr 2026 | +15 d | DWG-M-204 review |
| Now, read from the record | 02 Nov 2026 | +73 d | CR-014, DWG-M-204, SPEC-M-031 |
One version of the truth across the portfolio, with every slip explained by a document they can cite.
Defend the schedule against scope creep, and move quickly when the slip was not theirs.
It respects your logic and stays out of your file. Validate the depth before anyone above you adopts it.
Les produits partagent une même lecture du dossier du projet. Rien n’est téléversé deux fois.
Bring a P6 or MS Project file and the project it belongs to. In twenty minutes we walk you through every slip and what drove it.