The Storia blog
Insights. Engineered.
Practitioner-led writing on construction intelligence.
Engineering
View all →Building a trusted construction knowledge graph
Construction projects produce too much information, scattered across dozens of record types. A knowledge graph can connect it into one story, but only if the system around the model decides what is reliable enough to keep.
9 min
The part of an AI agent that actually does the thinking
An AI agent isn't a chatbot with a better prompt. The real work happens before it ever generates a word, in deciding what to look up and whether it knows enough to answer.
7 min
Newsletter
Stay sharp on construction intelligence
Insights on knowledge graphs, dispute resolution, and claims, delivered twice a month.