Quebec
Browse1
Articles28
- Prórroga de plazoUn instrumento contractual que desplaza la fecha de terminación porque las obras se retrasaron por un evento que no era riesgo del contratista, liberándolo de responsabilidad por los daños de terminación tardía. Si ese mismo…Reviewed 13 oct 2026
- Retrasos concurrentesHay retraso concurrente cuando un evento de riesgo del comitente y un evento de riesgo del contratista causan ambos el mismo periodo de sobrepaso crítico. No está resuelto en ningún ordenamiento. Sobre un mismo sobrepaso de…Reviewed 13 oct 2026
- Notice and time barsA notice clause is a time bar where the contract makes the extension of time conditional on serving notice within a stated period. Under FIDIC 2017 Sub-Clause 20.2.1 and NEC4 clause 61.3 failure forfeits entitlement outright.…Reviewed 13 oct 2026
- Métodos de análisis de retrasos comparados: cuál pueden sostener sus registrosUn método de análisis de retrasos es la técnica empleada para probar que un evento con derecho a prórroga retrasó la terminación. El SCL Delay and Disruption Protocol, 2nd Edition (February 2017) recoge en una tabla seis métodos…Reviewed 13 oct 2026
- Prolongation and delay costsAn extension of time and compensation are separate gateways: winning the time does not win the money. Prolongation cost is assessed for the period when the effect of the employer risk event was actually felt, not the overrun at…Reviewed 7 ago 2026
- Records and evidence for an EOT claimThe records a project keeps decide which delay analysis methods it can run, and that set closes long before anyone knows there is a dispute. The SCL Delay and Disruption Protocol, 2nd Edition (February 2017) names six record…Reviewed 13 oct 2026
- Modelos de aviso de retraso para AS 4000, FIDIC 2017 y CCDC 2Un aviso de retraso deja constancia a tiempo de un solo hecho: que algo ha retrasado, o retrasará, la obra, y que usted reclama el plazo. AS 4000 exige un aviso de retraso con prontitud conforme a la cl 34.2 y, después, una…Reviewed 13 oct 2026
- Cómo redactar una reclamación de prórrogaUna reclamación de prórroga de plazo prospera cuando prueba, en los propios términos del contrato y dentro de sus plazos, cuatro cosas: una causa de retraso que da derecho que no era riesgo del contratista, que esa causa retrasó…Reviewed 13 oct 2026
- Lista de verificación de la reclamación de prórrogaUna reclamación de prórroga de plazo está lista cuando una persona ajena al proyecto podría comprobar cada una de sus afirmaciones contra un registro fechado. Eso significa que hay siete elementos en su sitio: el fundamento…Reviewed 13 oct 2026
- Extension of time in QuebecIn Quebec there is no statutory completion date, no statutory extension-of-time mechanism, and no "time at large". Time is entirely a creature of contract, and when a Quebec court relieves a contractor of delay consequences it…Reviewed 8 ago 2026
- Quebec vs common-law Canada: what a common lawyer gets wrong about delayQuebec is a civil-law jurisdiction inside a common-law federation, and the delay doctrines a Canadian practitioner relies on mostly do not exist there. There is no time at large, no concurrent-delay doctrine, no imprévision and…Reviewed 8 ago 2026
- The Civil Code framework for delay in QuebecThe Code civil du Québec contains no provision on time for completion, delay or extension of time. Arts 2098–2129 were read individually. Time appears once, at art 2102, as a pre-contractual disclosure duty on the contractor.…Reviewed 8 ago 2026
- Notice and time bars in QuebecQuebec enforces contractual claim time bars strictly: a missed notice or claim deadline normally forfeits the entitlement, whatever the merits. Only three arguments defeat one: waiver, breach of the owner's obligation de…Reviewed 8 ago 2026
- Concurrent delay in QuebecQuebec has no doctrine of concurrent delay. No Quebec authority, doctrine or professional commentary on « délais concomitants » as a distinct doctrine was located. Where two causes operate on the same overrun, a Quebec court…Reviewed 8 ago 2026
- Delay penalties and the clause pénale in QuebecQuebec has no penalty versus liquidated-damages distinction. A clause pénale is valid under art 1622 C.c.Q. and enforceable without proof of loss under art 1623 para 1. The remedy is reduction, not nullity: art 1623 para 2 allows…Reviewed 8 ago 2026
- Extension of time in CanadaCanadian delay and extension-of-time law is almost entirely common law and contract. No province or territory has a statute addressing construction delay as such. On procedure Canada is close to England and strict, on remedy it…Reviewed 10 sept 2026
- Delay regimes by Canadian province: what changes at the borderNo Canadian province or territory has a statute addressing construction delay as such, so delay law is common law and contract everywhere. What changes at the border is the machinery around the claim: whether a limitation period…Reviewed 8 sept 2026
- Notice and time bars in CanadaCanadian courts enforce construction notice clauses as conditions precedent, and the owner need not prove prejudice. Under CCDC 2 – 2020 GC 6.5.4 the contractor has 10 Working Days from the commencement of the delay not from its…Reviewed 10 sept 2026
- Concurrent delay in CanadaCanadian courts treat delays as concurrent where delays to co-critical and co-controlling activities overlap, and they apportion time and money alike. On remedy that is closer to the United States than to England, which awards a…Reviewed 13 oct 2026
- Liquidated damages and the penalty rule in CanadaCanada has not adopted Cavendish Square v Makdessi. A delay liquidated damages clause is enforceable only if the rate is a genuine pre-estimate of loss, and is separately vulnerable to an unconscionability challenge. Where the…Reviewed 8 sept 2026
- Prevention principle and time at large in CanadaIn Canada an owner that has prevented the contractor from completing on time cannot insist on liquidated damages, and where no extension is granted the completion date can fall away. Perini Pacific is the anchor, but the domestic…Reviewed 10 sept 2026
- Prolongation and delay costs in CanadaCanadian law compensates delay through two routes: the contract's own reimbursement clause and damages for breach. Extended site overhead, unabsorbed head-office overhead, equipment standby and acceleration are all recoverable in…Reviewed 8 sept 2026
- Modificaciones de obraUn cambio en el alcance contractual, ordenado bajo la propia potestad de modificación del contrato y valorado por la maquinaria de precios del contrato. Si una partida es una modificación es cuestión de interpretación del…Reviewed 13 oct 2026
- What counts as a variationA variation is a change to the design, quality or quantity of the works as defined by the contract documents, instructed under the contract's change mechanism. Whether an item qualifies is a question of construing the contract,…Reviewed 13 oct 2026
- Written instruction and waiverA variation is compensable only if instructed, in writing, by the named person, before the cut-off. Whether an unwritten instruction can still be paid for depends entirely on the regime: England enforces the formality, Australia…Reviewed 13 oct 2026
- Constructive and deemed variationsConstructive change is a United States doctrine: work beyond the contract requirements, ordered expressly or impliedly by the government. No doctrine of that name exists elsewhere: England, Canada, Australia and FIDIC use deemed…Reviewed 13 oct 2026
- Valuation and the pricing ladderAlmost every construction contract values a variation by climbing a ladder (contract rates, then adjusted rates, then a fair valuation, then daywork) and a party may not skip a rung because it prefers the answer further up. NEC4…Reviewed 26 sept 2026
- Change order releases and reservation of rightsElement 5 of the variation claim, and the one with no extension-of-time analogue: the impact claim you meant to bring at the end has already been released by the change orders you signed along the way. Impact claims die in signed…Reviewed 6 oct 2026
The notice brief
One email a month on claims, notices and the cases that decided them.
The notice briefIssue 01 · sample
This month: three notice clocks and their judgments.
- 01Notice and time bars in OntarioIn Ontario a contractual notice of delay is a condition precedent: miss it and the claim is…
- 02Notice and time bars in AustraliaAustralian EOT time bars are enforceable conditions precedent everywhere, subject to the…
- 03Modelos de aviso de retraso para AS 4000, FIDIC 2017 y CCDC 2Un aviso de retraso deja constancia a tiempo de un solo hecho: que algo ha retrasado, o…
Each issue links to the full articles in the Storia Library.