Australie
Choisir un État1
Articles37
- Prolongation de délaiUn instrument contractuel qui déplace la date d'achèvement parce que les travaux ont été retardés par un événement qui ne relevait pas du risque de l'entrepreneur, le libérant de sa responsabilité pour les dommages d'achèvement…Reviewed 10 nov. 2026
- Retards concomitantsIl y a retard concomitant lorsqu'un événement relevant du risque du maître de l'ouvrage et un événement relevant du risque de l'entrepreneur causent tous deux la même période de dépassement critique. Ce point n'est réglé nulle…Reviewed 13 oct. 2026
- Notice and time barsA notice clause is a time bar where the contract makes the extension of time conditional on serving notice within a stated period. Under FIDIC 2017 Sub-Clause 20.2.1 and NEC4 clause 61.3 failure forfeits entitlement outright.…Reviewed 24 nov. 2026
- Méthodes d'analyse de retard comparées : laquelle vos documents peuvent étayerUne méthode d'analyse de retard est la technique employée pour prouver qu'un événement ouvrant droit a retardé l'achèvement. Le SCL Delay and Disruption Protocol, 2nd Edition (February 2017) présente sous forme de tableau six…Reviewed 13 oct. 2026
- Prolongation and delay costsAn extension of time and compensation are separate gateways: winning the time does not win the money. Prolongation cost is assessed for the period when the effect of the employer risk event was actually felt, not the overrun at…Reviewed 24 nov. 2026
- Records and evidence for an EOT claimThe records a project keeps decide which delay analysis methods it can run, and that set closes long before anyone knows there is a dispute. The SCL Delay and Disruption Protocol, 2nd Edition (February 2017) names six record…Reviewed 13 oct. 2026
- Modèles d'avis de retard pour l'AS 4000, le FIDIC 2017 et le CCDC 2Un avis de retard consigne un seul fait, en temps utile : qu'un événement a retardé, ou retardera, les travaux, et que vous réclamez le délai. L'AS 4000 exige un avis de retard sans délai au titre de la cl 34.2, puis une demande…Reviewed 24 nov. 2026
- Claim deadline calculator: notice, payment, lien and limitation datesA claim deadline is a contractual or statutory day by which something must be done, or the right it protects is lost or weakened: a notice of delay, a payment response, a lien, an adjudication step or a limitation period. This…Reviewed 24 nov. 2026
- Claim deadline register: construction notice, payment and limitation periodsA register of the claim deadlines this library records for Ontario, British Columbia, United States federal contracts, England and Wales and FIDIC 2017: notices of delay and claims, payment and adjudication steps, liens and…Reviewed 24 nov. 2026
- Comment rédiger une demande de prolongation de délaiUne demande de prolongation de délai aboutit lorsqu'elle prouve, selon les termes mêmes du contrat et dans ses délais, quatre choses : une cause de retard ouvrant droit qui ne relevait pas du risque de l'entrepreneur, le fait…Reviewed 13 oct. 2026
- Liste de contrôle avant une demande de prolongationUne demande de prolongation de délai est prête lorsqu'une personne étrangère au projet pourrait vérifier chacune de ses affirmations au regard d'une pièce datée. Cela suppose que sept éléments soient en place : le fondement…Reviewed 13 oct. 2026
- EOT claims expert or lawyer? What to do before you hire oneAn EOT claims expert's or a construction lawyer's time goes furthest when they are called before the notice deadline runs and handed the executed contract, every schedule update as a native file, and a dated record of events. A…Reviewed 10 nov. 2026
- Extension of time in AustraliaAustralian delay and extension-of-time law runs on one common law and eight statutory regimes. Doctrine. Prevention, penalties, concurrency, global claims, delay analysis. Does not change at the state line. What changes is the…Reviewed 26 sept. 2026
- Prevention principle and time at large in AustraliaIn Australia the prevention principle has been largely displaced by the Superintendent's unilateral power to extend time, which must be exercised honestly and fairly. A principal that will not use it for delay it caused loses its…Reviewed 13 oct. 2026
- Concurrent delay in AustraliaAustralia has no judicial default on concurrent delay. The answer is set entirely by contract. AS 4000-1997 cl 34.4 apportions overlapping delay. AS 2124-1992 cl 35.5 denies an extension of time for the concurrent period…Reviewed 1 sept. 2026
- Notice and time bars in AustraliaAustralian EOT time bars are enforceable conditions precedent everywhere, subject to the Superintendent's duty to act honestly, waiver, and the weak Gaymark argument. Since 15 April 2026, Victoria joins Western Australia as the…Reviewed 26 sept. 2026
- Liquidated damages and penalties in AustraliaAustralia runs its own penalties doctrine, wider than England's at the gateway and narrower nowhere. Andrews v ANZ [2012] HCA 30 lets a stipulation be struck even without breach. Paciocco [2016] HCA 28 sets an "out of all…Reviewed 1 sept. 2026
- Prolongation and delay costs in AustraliaAustralian law lets a delayed contractor recover extended site overhead, actual off-site overhead, plant standby, escalation and lost profit or opportunity, but by proof of actual cost, not by formula. No Australian decision has…Reviewed 1 sept. 2026
- Global claims and total cost in AustraliaA global (or total cost) claim lumps prolongation losses together instead of linking each loss to a specific compensable event. Australian law permits this only where apportionment is proved impracticable, and unlike England or…Reviewed 13 oct. 2026
- Acceleration in Australian Construction ClaimsConstructive acceleration is not a recognised doctrine in Australian law. Contractors instead recover acceleration costs as damages for breach of the Superintendent's duty to administer the extension-of-time machinery honestly…Reviewed 1 sept. 2026
- Delay analysis methods in AustraliaAustralian courts choose delay-analysis methodology from the facts, not from a protocol. White Constructions [2019] NSWSC 1166 held the SCL Delay and Disruption Protocol is not a rule of law and rejected both parties' experts.…Reviewed 1 sept. 2026
- Records and expert evidence in AustraliaAustralian delay claims are won or lost on contemporaneous records and on an expert who can expose their reasoning under Makita. Concurrent evidence. "hot-tubbing". Is an Australian invention now used worldwide, but no located…Reviewed 1 sept. 2026
- Limitation and Long-Stops: AustraliaAustralian breach-of-contract claims carry a six-year limitation period, except the Northern Territory's three years. Five states and territories also run a building-action long-stop of about ten years. Absent in Queensland and…Reviewed 1 sept. 2026
- Security of Payment and Adjudication: AustraliaEvery Australian jurisdiction now lets an adjudicator value a delay or prolongation claim, on a payment-claim timetable measured in business days. No statute names extension of time, so it arrives through valuation,…Reviewed 26 sept. 2026
- AvenantsUne modification de l'étendue contractuelle des travaux, ordonnée en vertu du pouvoir de modification que le contrat prévoit lui-même, et évaluée par la mécanique de prix que le contrat fournit. Savoir si un poste est un avenant…Reviewed 13 oct. 2026
- What counts as a variationA variation is a change to the design, quality or quantity of the works as defined by the contract documents, instructed under the contract's change mechanism. Whether an item qualifies is a question of construing the contract,…Reviewed 13 oct. 2026
- Written instruction and waiverA variation is compensable only if instructed, in writing, by the named person, before the cut-off. Whether an unwritten instruction can still be paid for depends entirely on the regime: England enforces the formality, Australia…Reviewed 13 oct. 2026
- Constructive and deemed variationsConstructive change is a United States doctrine: work beyond the contract requirements, ordered expressly or impliedly by the government. No doctrine of that name exists elsewhere: England, Canada, Australia and FIDIC use deemed…Reviewed 13 oct. 2026
- Valuation and the pricing ladderAlmost every construction contract values a variation by climbing a ladder (contract rates, then adjusted rates, then a fair valuation, then daywork) and a party may not skip a rung because it prefers the answer further up. NEC4…Reviewed 26 sept. 2026
- Change order releases and reservation of rightsElement 5 of the variation claim, and the one with no extension-of-time analogue: the impact claim you meant to bring at the end has already been released by the change orders you signed along the way. Impact claims die in signed…Reviewed 6 oct. 2026
- Les réclamations pour avenant en Australie : AS 4000, AS 2124 et les changements de 2026Une réclamation pour avenant en Australie se gagne ou se perd sur trois choses : qui a ordonné les travaux, par écrit, et avant quelle date ; si les travaux étaient réellement hors du contrat ; et, depuis le 15 avril 2026, où la…Reviewed 26 sept. 2026
- Avenants verbaux en Australie : pourquoi Rock Advertising n'a jamais traverséEn Australie, une clause exigeant que les avenants soient faits par écrit n'empêche pas le Principal et le Contractor de convenir d'un avenant verbalement ou par leur comportement, et elle ne fait pas échec à un estoppel. Liebe v…Reviewed 26 sept. 2026
- Avenants réputés et conditions latentes selon l'AS 4000 en AustralieL'Australie n'a pas de doctrine appelée constructive change. Les travaux que personne n'a formellement ordonnés entrent dans le compte des avenants par quatre autres voies : une disposition de présomption expresse du contrat…Reviewed 26 sept. 2026
- Évaluer un avenant selon l'AS 4000 en AustralieSelon l'AS 4000 (et, d'après les synthèses, l'AS 4902), un avenant ordonné est évalué selon un ordre fixe : accord préalable, puis taux ou prix du Contrat, puis taux d'un bordereau chiffré, même s'il n'est pas un document…Reviewed 26 sept. 2026
- Modèles d'avis d'avenant pour l'AS 4000 et l'AS 2124Un avis d'avenant consigne un seul fait : qu'un ordre a modifié les travaux, avis donné à la bonne personne, par écrit, dans les délais. Selon l'AS 4000 (1997 et 2025), l'avenant lui-même doit être ordonné par écrit par le…Reviewed 6 oct. 2026
- Les avenants dans l'État de Victoria : sécurité des paiements après le 15 avril 2026Le Victoria était autrefois la seule juridiction australienne où un avenant contesté, sur la plupart des grands contrats, ne pouvait pas être soumis à l'adjudication. Le 15 avril 2026, il a abrogé le régime des « claimable…Reviewed 26 sept. 2026
- Réclamations d'avenant en adjudication au Victoria : art. 10A–10B abrogés, art. 13A en vigueurDepuis le 15 avril 2026, un avenant contesté peut être inclus dans un payment claim victorien et soumis à l'adjudication comme n'importe quel autre montant : le régime des « claimable variation » et des « excluded amounts » des…Reviewed 26 sept. 2026
The notice brief
One email a month on claims, notices and the cases that decided them.
The notice briefIssue 01 · sample
This month: three notice clocks and their judgments.
- 01Notice and time bars in OntarioIn Ontario a contractual notice of delay is a condition precedent: miss it and the claim is…
- 02Notice and time bars in AustraliaAustralian EOT time bars are enforceable conditions precedent everywhere, subject to the…
- 03Modèles d'avis de retard pour l'AS 4000, le FIDIC 2017 et le CCDC 2Un avis de retard consigne un seul fait, en temps utile : qu'un événement a retardé, ou…
Each issue links to the full articles in the Storia Library.