Australia
Elegir un estado1
Articles37
- Prórroga de plazoUn instrumento contractual que desplaza la fecha de terminación porque las obras se retrasaron por un evento que no era riesgo del contratista, liberándolo de responsabilidad por los daños de terminación tardía. Si ese mismo…Reviewed 10 nov 2026
- Retrasos concurrentesHay retraso concurrente cuando un evento de riesgo del comitente y un evento de riesgo del contratista causan ambos el mismo periodo de sobrepaso crítico. No está resuelto en ningún ordenamiento. Sobre un mismo sobrepaso de…Reviewed 13 oct 2026
- Notice and time barsA notice clause is a time bar where the contract makes the extension of time conditional on serving notice within a stated period. Under FIDIC 2017 Sub-Clause 20.2.1 and NEC4 clause 61.3 failure forfeits entitlement outright.…Reviewed 24 nov 2026
- Métodos de análisis de retrasos comparados: cuál pueden sostener sus registrosUn método de análisis de retrasos es la técnica empleada para probar que un evento con derecho a prórroga retrasó la terminación. El SCL Delay and Disruption Protocol, 2nd Edition (February 2017) recoge en una tabla seis métodos…Reviewed 13 oct 2026
- Prolongation and delay costsAn extension of time and compensation are separate gateways: winning the time does not win the money. Prolongation cost is assessed for the period when the effect of the employer risk event was actually felt, not the overrun at…Reviewed 24 nov 2026
- Records and evidence for an EOT claimThe records a project keeps decide which delay analysis methods it can run, and that set closes long before anyone knows there is a dispute. The SCL Delay and Disruption Protocol, 2nd Edition (February 2017) names six record…Reviewed 13 oct 2026
- Modelos de aviso de retraso para AS 4000, FIDIC 2017 y CCDC 2Un aviso de retraso deja constancia a tiempo de un solo hecho: que algo ha retrasado, o retrasará, la obra, y que usted reclama el plazo. AS 4000 exige un aviso de retraso con prontitud conforme a la cl 34.2 y, después, una…Reviewed 24 nov 2026
- Claim deadline calculator: notice, payment, lien and limitation datesA claim deadline is a contractual or statutory day by which something must be done, or the right it protects is lost or weakened: a notice of delay, a payment response, a lien, an adjudication step or a limitation period. This…Reviewed 24 nov 2026
- Claim deadline register: construction notice, payment and limitation periodsA register of the claim deadlines this library records for Ontario, British Columbia, United States federal contracts, England and Wales and FIDIC 2017: notices of delay and claims, payment and adjudication steps, liens and…Reviewed 24 nov 2026
- Cómo redactar una reclamación de prórrogaUna reclamación de prórroga de plazo prospera cuando prueba, en los propios términos del contrato y dentro de sus plazos, cuatro cosas: una causa de retraso que da derecho que no era riesgo del contratista, que esa causa retrasó…Reviewed 13 oct 2026
- Lista de verificación de la reclamación de prórrogaUna reclamación de prórroga de plazo está lista cuando una persona ajena al proyecto podría comprobar cada una de sus afirmaciones contra un registro fechado. Eso significa que hay siete elementos en su sitio: el fundamento…Reviewed 13 oct 2026
- EOT claims expert or lawyer? What to do before you hire oneAn EOT claims expert's or a construction lawyer's time goes furthest when they are called before the notice deadline runs and handed the executed contract, every schedule update as a native file, and a dated record of events. A…Reviewed 10 nov 2026
- Extension of time in AustraliaAustralian delay and extension-of-time law runs on one common law and eight statutory regimes. Doctrine. Prevention, penalties, concurrency, global claims, delay analysis. Does not change at the state line. What changes is the…Reviewed 26 sept 2026
- Prevention principle and time at large in AustraliaIn Australia the prevention principle has been largely displaced by the Superintendent's unilateral power to extend time, which must be exercised honestly and fairly. A principal that will not use it for delay it caused loses its…Reviewed 13 oct 2026
- Concurrent delay in AustraliaAustralia has no judicial default on concurrent delay. The answer is set entirely by contract. AS 4000-1997 cl 34.4 apportions overlapping delay. AS 2124-1992 cl 35.5 denies an extension of time for the concurrent period…Reviewed 1 sept 2026
- Notice and time bars in AustraliaAustralian EOT time bars are enforceable conditions precedent everywhere, subject to the Superintendent's duty to act honestly, waiver, and the weak Gaymark argument. Since 15 April 2026, Victoria joins Western Australia as the…Reviewed 26 sept 2026
- Liquidated damages and penalties in AustraliaAustralia runs its own penalties doctrine, wider than England's at the gateway and narrower nowhere. Andrews v ANZ [2012] HCA 30 lets a stipulation be struck even without breach. Paciocco [2016] HCA 28 sets an "out of all…Reviewed 1 sept 2026
- Prolongation and delay costs in AustraliaAustralian law lets a delayed contractor recover extended site overhead, actual off-site overhead, plant standby, escalation and lost profit or opportunity, but by proof of actual cost, not by formula. No Australian decision has…Reviewed 1 sept 2026
- Global claims and total cost in AustraliaA global (or total cost) claim lumps prolongation losses together instead of linking each loss to a specific compensable event. Australian law permits this only where apportionment is proved impracticable, and unlike England or…Reviewed 13 oct 2026
- Acceleration in Australian Construction ClaimsConstructive acceleration is not a recognised doctrine in Australian law. Contractors instead recover acceleration costs as damages for breach of the Superintendent's duty to administer the extension-of-time machinery honestly…Reviewed 1 sept 2026
- Delay analysis methods in AustraliaAustralian courts choose delay-analysis methodology from the facts, not from a protocol. White Constructions [2019] NSWSC 1166 held the SCL Delay and Disruption Protocol is not a rule of law and rejected both parties' experts.…Reviewed 1 sept 2026
- Records and expert evidence in AustraliaAustralian delay claims are won or lost on contemporaneous records and on an expert who can expose their reasoning under Makita. Concurrent evidence. "hot-tubbing". Is an Australian invention now used worldwide, but no located…Reviewed 1 sept 2026
- Limitation and Long-Stops: AustraliaAustralian breach-of-contract claims carry a six-year limitation period, except the Northern Territory's three years. Five states and territories also run a building-action long-stop of about ten years. Absent in Queensland and…Reviewed 1 sept 2026
- Security of Payment and Adjudication: AustraliaEvery Australian jurisdiction now lets an adjudicator value a delay or prolongation claim, on a payment-claim timetable measured in business days. No statute names extension of time, so it arrives through valuation,…Reviewed 26 sept 2026
- Modificaciones de obraUn cambio en el alcance contractual, ordenado bajo la propia potestad de modificación del contrato y valorado por la maquinaria de precios del contrato. Si una partida es una modificación es cuestión de interpretación del…Reviewed 13 oct 2026
- What counts as a variationA variation is a change to the design, quality or quantity of the works as defined by the contract documents, instructed under the contract's change mechanism. Whether an item qualifies is a question of construing the contract,…Reviewed 13 oct 2026
- Written instruction and waiverA variation is compensable only if instructed, in writing, by the named person, before the cut-off. Whether an unwritten instruction can still be paid for depends entirely on the regime: England enforces the formality, Australia…Reviewed 13 oct 2026
- Constructive and deemed variationsConstructive change is a United States doctrine: work beyond the contract requirements, ordered expressly or impliedly by the government. No doctrine of that name exists elsewhere: England, Canada, Australia and FIDIC use deemed…Reviewed 13 oct 2026
- Valuation and the pricing ladderAlmost every construction contract values a variation by climbing a ladder (contract rates, then adjusted rates, then a fair valuation, then daywork) and a party may not skip a rung because it prefers the answer further up. NEC4…Reviewed 26 sept 2026
- Change order releases and reservation of rightsElement 5 of the variation claim, and the one with no extension-of-time analogue: the impact claim you meant to bring at the end has already been released by the change orders you signed along the way. Impact claims die in signed…Reviewed 6 oct 2026
- Reclamaciones por modificaciones en Australia: AS 4000, AS 2124 y los cambios de 2026Una reclamación por modificación en Australia se gana o se pierde en tres extremos: quién ordenó la obra, por escrito, y antes de qué fecha; si la obra estaba realmente fuera del contrato; y, desde el 15 de abril de 2026, dónde…Reviewed 26 sept 2026
- Modificaciones verbales en Australia: por qué Rock Advertising nunca cruzóEn Australia, una cláusula que exige que las modificaciones consten por escrito no impide que el Principal y el Contractor acuerden una modificación verbalmente o por actos concluyentes, ni derrota una estoppel. Liebe v Molloy…Reviewed 26 sept 2026
- Modificaciones presuntas y condiciones latentes según AS 4000 en AustraliaAustralia no tiene una doctrina llamada constructive change. La obra que nadie ordenó formalmente llega a la cuenta de modificaciones por otras cuatro vías: una disposición contractual expresa de presunción (bajo AS 4000:2025,…Reviewed 26 sept 2026
- Valorar una modificación según AS 4000: cómo se valora una modificación en AustraliaBajo AS 4000 (y, según los resúmenes, AS 4902) una modificación ordenada se valora descendiendo por un orden fijo: acuerdo previo, después precios o tarifas del Contrato, después tarifas de un listado valorado aunque no sea…Reviewed 26 sept 2026
- Plantillas de aviso de modificación para AS 4000 y AS 2124Un aviso de modificación deja constancia de un solo hecho: que una orden cambió la obra, y lo hace ante la persona correcta, por escrito y a tiempo. Bajo AS 4000 (1997 y 2025) la propia modificación debe ser ordenada por escrito…Reviewed 6 oct 2026
- Modificaciones en Victoria: seguridad de pago después del 15 de abril de 2026Victoria era la única jurisdicción australiana en la que una modificación disputada en la mayoría de los contratos grandes no podía someterse a adjudication. El 15 de abril de 2026 derogó el régimen de la "claimable variation" y…Reviewed 26 sept 2026
- Reclamaciones por modificaciones en la adjudication de Victoria: arts. 10A–10B derogados, art. 13A vigenteDesde el 15 de abril de 2026 una modificación disputada puede incluirse en un payment claim de Victoria y llevarse a adjudication como cualquier otro importe: el régimen de la "claimable variation" y de los "excluded amounts" de…Reviewed 26 sept 2026
The notice brief
One email a month on claims, notices and the cases that decided them.
The notice briefIssue 01 · sample
This month: three notice clocks and their judgments.
- 01Notice and time bars in OntarioIn Ontario a contractual notice of delay is a condition precedent: miss it and the claim is…
- 02Notice and time bars in AustraliaAustralian EOT time bars are enforceable conditions precedent everywhere, subject to the…
- 03Modelos de aviso de retraso para AS 4000, FIDIC 2017 y CCDC 2Un aviso de retraso deja constancia a tiempo de un solo hecho: que algo ha retrasado, o…
Each issue links to the full articles in the Storia Library.