Every article in the library, in one list. Articles with no place named state general practice and apply wherever you are building. A place is named where the law there, rather than the contract, sets the rule.

Filter
ArticleSectionPlaceReviewed
Extension of timeMoving the completion date. The four elements a time claim must establish, the five defences that beat sound ones, and where each element is taken further.Construction / ClaimsOctober 13, 2026
Concurrent delayFive competing definitions and nine different answers on one fact pattern. Not settled law in any jurisdiction surveyed.Construction / ClaimsOctober 13, 2026
Notice and time barsThe element that defeats more sound claims than the other three combined. Three incompatible philosophies, and the statutory overrides now cutting across them.Construction / ClaimsOctober 13, 2026
Delay analysis methods comparedSix delay analysis methods compared: what each needs, what it costs and how it is attacked, plus a chooser driven by timing, records and the contract.Construction / ClaimsOctober 13, 2026
Prolongation and delay costsThe money gateway. Compensation runs to the period the effect was felt, not to the weeks at the end of the job.Construction / ClaimsAugust 7, 2026
Records and evidenceWhich records support which analysis method, and what tribunals actually punish.Construction / ClaimsOctober 13, 2026
Delay notice templates for AS 4000, FIDIC 2017 and CCDC 2Six letters: the AS 4000 delay notice and EOT claim, the FIDIC Notice of Claim and fully detailed Claim, and the CCDC time and money notices. Plus when each clock starts.Construction / ClaimsOctober 13, 2026
How to write an EOT claimEight steps from reading the contract to submitting the claim, a claim document outline you can copy, and the reasons EOT claims most often fail.Construction / ClaimsOctober 13, 2026
EOT claim readiness checklistEight groups to tick off before and after you submit an extension of time claim: contract, notice, records, causation, concurrency and float, quantum, the document, and follow-up.Construction / ClaimsOctober 13, 2026
Extension of time in QuebecQuebec's Civil Code says nothing about time for completion. What fills the gap, and why a delay claim here is pleaded as fault rather than as entitlement.Construction / ClaimsQuebecAugust 8, 2026
Quebec vs common-law CanadaThirty-nine points at which a common-law-trained practitioner will get Quebec wrong, and the five things to fix in an imported precedent.Construction / ClaimsQuebecAugust 8, 2026
The Civil Code framework for delayArts 2098 to 2129 C.c.Q. contain no completion date and no extension mechanism. What follows from that absence.Construction / ClaimsQuebecAugust 8, 2026
Notice and time bars in QuebecClaim procedures are enforced strictly, and there are exactly three ways round one, plus two clocks that run independently.Construction / ClaimsQuebecAugust 8, 2026
Concurrent delay in QuebecThere is no Quebec doctrine of concurrent delay. What apportionment of fault does instead, and why the burden starts against the contractor.Construction / ClaimsQuebecAugust 8, 2026
Delay penalties and the clause pénaleA penal clause is valid and enforceable without proof of loss, and reducible. The characterisation argument a common lawyer reaches for does not exist here.Construction / ClaimsQuebecAugust 8, 2026
Extension of time in CanadaCanadian delay law is common law and contract, and no province has a delay statute. Notice, concurrency, liquidated damages and what changes at the border.Construction / ClaimsCanadaSeptember 10, 2026
Delay regimes by Canadian provinceWhat actually changes when a delay claim crosses a provincial border: limitation variation, lien periods, adjudication scope and trust status.Construction / ClaimsCanadaSeptember 8, 2026
Notice and time bars in CanadaGC 6.5.4, the ten-working-day clock, and why the owner does not have to prove prejudice. Where a Canadian delay claim dies most often.Construction / ClaimsCanadaSeptember 10, 2026
Concurrent delay in CanadaCanada apportions. Schindler, Walsh v TTC, the critical-path evidentiary standard, and why the English full-extension rule does not travel.Construction / ClaimsCanadaOctober 13, 2026
Liquidated damages and the penalty rule in CanadaCanada has not adopted Cavendish. The two-limb test, Chandos anti-deprivation, and no statutory bar anywhere on no-damage-for-delay clauses.Construction / ClaimsCanadaSeptember 8, 2026
The prevention principle and time at large in CanadaPerini Pacific, the unreconciled no-damage-for-delay attribution, and the open question of whether a public-health order is a stop work order.Construction / ClaimsCanadaSeptember 10, 2026
Prolongation and delay costs in CanadaWhat is recoverable and how it is proved: Shore & Horwitz corrected, Ellis-Don corrected, and the Canadian authorities that do not exist.Construction / ClaimsCanadaSeptember 8, 2026
Extension of time in OntarioOntario made an extension of time adjudicable on 1 January 2026 and alone lets a contract shorten limitation. Five clocks, three regimes.Construction / ClaimsOntarioSeptember 10, 2026
Ontario delay claim clocksEvery deadline that can kill an Ontario delay claim, grouped by clock: notice, adjudication, lien, holdback and limitation, with the character in law of each.Construction / ClaimsOntarioSeptember 10, 2026
Notice and time bars in OntarioTechnicore, Elite, Ross-Clair and the limit of the rule in J.P. Thomson, plus the OAA/OGCA package that leaves GC 6.5 untouched.Construction / ClaimsOntarioSeptember 10, 2026
Prompt payment and adjudication in OntarioO. Reg. 264/25 s 19 made time adjudicable: ancillary, non-P3, and only on contracts dated on or after 1 January 2026.Construction / ClaimsOntarioSeptember 10, 2026
Limitation periods and claim accrual in OntarioOntario alone lets commercial parties shorten or exclude a limitation period, and Leveque shows how easily the clause is drafted wrong.Construction / ClaimsOntarioAugust 8, 2026
Liens, holdback and security in OntarioDoes an Ontario lien secure a delay claim? Partly, on a price-versus-damages line, with the 60/90 clocks unchanged and s 27.1 repealed.Construction / ClaimsOntarioSeptember 10, 2026
Extension of time in England and WalesJCT 2024 and NEC4 give time only through the contract. Prevention is a default rule, concurrency is unsettled, and adjudication decides most disputes.Construction / ClaimsEngland and WalesOctober 13, 2026
Concurrent delay in England and WalesTime but not money: Malmaison, Walter Lilly, Adyard and Thomas Barnes, contracting out after North Midland v Cyden, and the Scottish split.Construction / ClaimsEngland and WalesOctober 13, 2026
Notice and time bars in England and WalesWhen an English notice clause is a condition precedent: DBS v TCS, Steria and Multiplex, the JCT time and money split, and the NEC4 8-week bar.Construction / ClaimsEngland and WalesOctober 13, 2026
Prevention principle and time at large in England and WalesA default rule the contract can displace. Why time is rarely set at large in England, and the recent cases that let the argument go to trial.Construction / ClaimsEngland and WalesOctober 13, 2026
Adjudicating extensions of time in England and WalesAn adjudicator can take an extension down to zero, the first decision on delay tends to bind the next, and enforcement turns on natural justice.Construction / ClaimsEngland and WalesOctober 13, 2026
Delay notice templates for JCT 2024 and NEC4Letters for a JCT delay notice, particulars, material change and loss and expense, and for NEC4 compensation events and Project Manager silence.Construction / ClaimsEngland and WalesOctober 13, 2026
Extension of time in AlbertaThe best Canadian forum for a private delay claim and the worst for a public one. Two Acts, two regimes, and the forum is the risk, not the doctrine.Construction / ClaimsAlbertaAugust 9, 2026
Alberta delay claim clocksEvery deadline that can kill an Alberta delay claim, grouped by clock, and the procedural rules that bite after all of them are met.Construction / ClaimsAlbertaAugust 9, 2026
Prompt payment and adjudication in AlbertaThe widest consent gateway in Canada on private work, and a statutory carve-out of delay on provincial public works.Construction / ClaimsAlbertaAugust 9, 2026
Notice and time bars in AlbertaThe Public Works Act 45-day registered-mail notice, GC 6.5.4, and the appellate authority Alberta may not actually have.Construction / ClaimsAlbertaSeptember 10, 2026
Limitation periods and claim accrual in AlbertaTwo years from discovery, ten years ultimate, and a limitation period the parties may extend but cannot lawfully shorten.Construction / ClaimsAlbertaAugust 9, 2026
Liens, the lien fund and trust in AlbertaThree separate mechanisms, routinely conflated. No Certificate of Substantial Performance means no trust at all.Construction / ClaimsAlbertaAugust 9, 2026
Arbitration and forum in AlbertaDelay causation is mixed fact and law, so the award is final. One expert per subject matter, no construction list, and dismissal for delay.Construction / ClaimsAlbertaSeptember 10, 2026
Oil, gas and industrial construction in AlbertaNo standard EPC form, no turnaround authority, no AER-delay authority, and a lien that attaches to the mineral.Construction / ClaimsAlbertaAugust 9, 2026
Extension of time in British ColumbiaBC created the Canadian law of delay and has barely touched it since 2015. Lien clocks, purposive notice, apportionment, and no adjudication yet.Construction / ClaimsBritish ColumbiaSeptember 8, 2026
British Columbia delay claim clocksIn BC the clock that kills a delay claim is a Builders Lien Act clock, 45 days, 55 days, one year. Not the two-year Limitation Act.Construction / ClaimsBritish ColumbiaSeptember 8, 2026
Notice and time bars in British ColumbiaBC reads construction notice clauses purposively, not mechanically. Less strict than Ontario's Technicore line. And it cuts both ways.Construction / ClaimsBritish ColumbiaSeptember 10, 2026
Prevention and time at large in British ColumbiaBC holds the strongest candidate for a Canadian judgment finding time at large, Hawl-Mac (1985), plus both national prevention anchors.Construction / ClaimsBritish ColumbiaSeptember 8, 2026
Concurrent delay and apportionment in British ColumbiaBC apportions concurrent delay as damages, not entitlement, no Malmaison, no dominant cause, no first-in-time, and no ruling on North Midland drafting.Construction / ClaimsBritish ColumbiaSeptember 8, 2026
Prolongation, acceleration and quantum in British ColumbiaGolden Hill is probably not a BC acceleration case. What BC pays for delay: actual-cost overhead, the W A Stephenson total-cost gateway, no methodology.Construction / ClaimsBritish ColumbiaSeptember 8, 2026
Limitation periods and claim accrual in British ColumbiaIn BC the Builders Lien Act clocks, not the Limitation Act, kill delay claims. Contracting out is unsettled and no BC case decides accrual.Construction / ClaimsBritish ColumbiaSeptember 8, 2026
Liens, holdback and the statutory trust in British ColumbiaBC does have a construction trust. Builders Lien Act ss 10–14. The 45-day lien clock, 55-day holdback and hard one-year trust limit, explained.Construction / ClaimsBritish ColumbiaSeptember 8, 2026
Prompt payment and adjudication in British ColumbiaBC has no prompt payment or adjudication: the Construction Prompt Payment Act is not in force, and will apply only to contracts made after commencement.Construction / ClaimsBritish ColumbiaSeptember 8, 2026
Arbitration, experts and forum in British ColumbiaBC delay doctrine stalled because s 59 and Sattva make arbitral EOT findings unreviewable. The expert duty is s 35, and BC caps no experts.Construction / ClaimsBritish ColumbiaSeptember 8, 2026
Public works and infrastructure in British ColumbiaMOTI, Site C and BC P3 delay clauses compared: 14-day and 5-business-day notice, time-only weather relief, no Crown notice, climate risk left to drafting.Construction / ClaimsBritish ColumbiaSeptember 8, 2026
Extension of time in the United StatesThere is no single US rule. Federal contracting, private AIA-form work and each state's no-damage-for-delay law answer the same facts differently.Construction / ClaimsUnited StatesSeptember 1, 2026
United States delay claim clocksThree layers, and a claim can die at any of them: AIA's 21-day Claim window, FAR's stacked notice and cost cut-offs, and the CDA's six-year bar.Construction / ClaimsUnited StatesSeptember 1, 2026
Notice and time bars in the United StatesThe claim-within-a-claim trap. Whether a bare time request is itself a Claim, and why a Contracting Officer's grant of time never proves excusable delay.Construction / ClaimsUnited StatesSeptember 1, 2026
Prevention and time at large in the United StatesUS law has neither doctrine. The same commercial result runs through LD non-apportionment, the implied duty not to hinder, and Spearin.Construction / ClaimsUnited StatesSeptember 1, 2026
Concurrent delay in the United StatesConcurrency is a rule of proof, not substantive law. In federal practice the contractor, not the owner, carries the burden of separating the delays.Construction / ClaimsUnited StatesOctober 6, 2026
No-damage-for-delay clauses in the United StatesThe same clause is enforceable in Texas and void in Ohio. Sixteen state statutes, eight verified and eight reported, plus the Rhode Island error corrected.Construction / ClaimsUnited StatesSeptember 1, 2026
Acceleration and constructive acceleration in the United StatesA claim parasitic on the extension-of-time claim. The Fraser five elements, where claims die under Amatea/Grimberg, and the rules on protest and cost.Construction / ClaimsUnited StatesSeptember 1, 2026
Extension of time in AustraliaAustralia rejected Gaymark and enforces time bars, but two states now let a tribunal strike an unfair one out. Security of payment runs state by state.Construction / ClaimsAustraliaSeptember 26, 2026
Prevention and time at large in AustraliaTime at large has been declined repeatedly since Gaymark. The orthodoxy is that a contractor who fails to claim an extension keeps the completion date.Construction / ClaimsAustraliaOctober 13, 2026
Concurrent delay in AustraliaAS 4000-1997 apportions overlapping delay and AS 2124-1992 denies it. The form decides the answer, and 84% of forms are amended.Construction / ClaimsAustraliaSeptember 1, 2026
Notice and time bars in AustraliaTime bars are enforced, with a new exception: Western Australia since 2022 and Victoria since 2025 can strike out a notice provision that is unfair.Construction / ClaimsAustraliaSeptember 26, 2026
Liquidated damages and penalties in AustraliaAndrews means a stipulation can be struck without any breach at all, and Paciocco puts Australia further from England than before Cavendish.Construction / ClaimsAustraliaSeptember 1, 2026
Prolongation and delay costs in AustraliaNo formula jurisprudence. Australian courts want actual cost proved contemporaneously, which is what most prolongation claims cannot produce.Construction / ClaimsAustraliaSeptember 1, 2026
Global claims and total cost in AustraliaWhat a global claim has to plead in Australia, why Cessnock is not the delay authority it is cited as, and where the total-cost route still fails.Construction / ClaimsAustraliaOctober 13, 2026
Acceleration in AustraliaThere is no constructive acceleration doctrine. The claim is breach of the Superintendent's duty, and pleading the American doctrine loses it.Construction / ClaimsAustraliaSeptember 1, 2026
Delay analysis methods in AustraliaFour decisions, four positions, thirteen years. Alstom, White Constructions, V601 and Santos v Fluor disagree on what a method has to be.Construction / ClaimsAustraliaSeptember 1, 2026
Records and expert evidence in AustraliaConcurrent evidence, the Harmonised Expert Witness Code, and why White Constructions turned on records rather than on methodology.Construction / ClaimsAustraliaSeptember 1, 2026
Limitation and long-stops in AustraliaSix years almost everywhere, three in the Northern Territory, and a ten-year building long-stop in Victoria that substitutes rather than sits alongside.Construction / ClaimsAustraliaSeptember 1, 2026
Security of payment in AustraliaEight regimes, two models, and the question that decides a delay claim: whether an extension of time is adjudicable at all in that state.Construction / ClaimsAustraliaSeptember 26, 2026
VariationsScope and price. The five elements a variation claim must establish, why agreeing a value may not pay for the time it cost, and where each element is taken further.Construction / ClaimsOctober 13, 2026
What counts as a variationThe scope question, and why the Privy Council held in 2026 that it turns on the contract terms rather than on how the parties behaved on site.Construction / ClaimsOctober 13, 2026
Written instruction and waiverYou did the work and there is no written instruction. Five regimes, five answers, and on US public work the rule is one estoppel cannot cure.Construction / ClaimsOctober 13, 2026
Constructive and deemed variationsThe claim for a variation nobody instructed, and why the doctrine does not exist outside the United States, only functional substitutes measured differently.Construction / ClaimsOctober 13, 2026
Valuation and the pricing ladderContract rates, then adjusted rates, then a fair valuation, then daywork. You may not skip a rung, and NEC4 has no ladder at all.Construction / ClaimsSeptember 26, 2026
Change order releasesImpact claims die in signed change orders, not in tribunals. The reservation language that works, and two citations the commentary gets backwards.Construction / ClaimsOctober 6, 2026
Change orders in the United StatesConstructive change, cardinal change and the release on the bilateral modification. Federal and private US change-order practice, and California's statutory procedure.Construction / ClaimsUnited StatesSeptember 22, 2026
Written instruction and waiver in the United StatesNo signed change order. Private work can be waived by conduct; public and federal work turn on authority, not formality, and only the Contracting Officer binds the government.Construction / ClaimsUnited StatesSeptember 22, 2026
Constructive change in the United StatesThe Bell/Heery two-element test, the FAR 52.243-4 clause that carries it, and why Spearin is narrower than it is usually stated.Construction / ClaimsUnited StatesSeptember 22, 2026
Cardinal change in the United StatesWhen a change stops being a change and becomes a breach. A cost multiple alone rarely gets there, and only one state high court has expressly adopted the doctrine.Construction / ClaimsUnited StatesSeptember 22, 2026
Change order releases and reservation of rights in the United StatesBell BCI is why a change-order release is a genuine claim-killer — the Federal Circuit reversed the contractor's cumulative-impact win. What the release does, and the reservation that held in Alares.Construction / ClaimsUnited StatesOctober 6, 2026
Change orders in CaliforniaCalifornia's private/public split on authority to bind the owner, CACI No. 4522, and the SB 440 statutory claim procedure that takes effect 1 January 2026.Construction / ClaimsCaliforniaSeptember 22, 2026
California SB 440: the change-order payment statuteFrom 1 January 2026, Cal. Civ. Code §§ 8850–8851 give private-works contractors a 30-day owner statement, 60-day payment, 2% monthly interest and a stop-work right. It is not adjudication.Construction / ClaimsCaliforniaSeptember 22, 2026
Variation claims in Australia: AS 4000, AS 2124 and the 2026 changesWho directed the work, in writing and before when; why approving a 'variation' does not make one (Kaloriziko, 2025); the AS 4000 pricing ladder; and Victoria's 2026 security-of-payment changes.Construction / ClaimsAustraliaSeptember 26, 2026
Oral variations in Australia: why Rock Advertising never crossedA writing clause cannot stop the Principal and Contractor agreeing a variation orally. But under AS 4000 cl 36.1 an oral instruction is not a direction, so the claim must be proved as an agreement or estoppel with the Principal.Construction / ClaimsAustraliaSeptember 26, 2026
AS 4000 deemed variations and latent conditions in AustraliaAustralia has no constructive-change doctrine. What it has is contractual deeming: latent conditions priced as Variations under AS 4000, the 2025 edition's reported additions, and AS 2124's different measure.Construction / ClaimsAustraliaSeptember 26, 2026
AS 4000 variation pricing: how to value a variation in AustraliaAS 4000 cl 36.4 prices a variation by prior agreement, contract rates, a priced schedule, then reasonable rates. Kaloriziko (2025): pricing a non-variation does not make it a variation.Construction / ClaimsAustraliaSeptember 26, 2026
Variation notice templates for AS 4000 and AS 2124Five letters: request the Superintendent's written direction, notify a Variation, notify a latent condition, give the AS 2124 cl 46.1 notice, and submit the price. Plus which to send when, and the records behind each.Construction / ClaimsAustraliaOctober 6, 2026
Variations in Victoria: security of payment after 15 April 2026Victoria repealed the ss 10A–10B claimable-variation gateway on 15 April 2026 and added s 13A on unfair notice-based time bars: what changed for variation claims, and what is still open.Construction / ClaimsVictoriaSeptember 26, 2026
Variation claims in Victorian adjudication: ss 10A–10B gone, s 13A inSince 15 April 2026 a disputed Victorian variation can be adjudicated. What ss 10A–10B excluded, which claims s 54 keeps on the old rules, the new-reasons bar, and s 13A read from the Act.Construction / ClaimsVictoriaSeptember 26, 2026